Yutianhua Company held a kick-off meeting for the plant demolition project

2021-08-02View Original

Thread Content

Yutianhua Company held a mobilization meeting for the start of the plant demolition project. Author/Source: Shaanxi Yanchang Petroleum Yulin Coal Chemical Co., Ltd. Date: 2021-08-02. Clicks: 14. On the morning of July 29, a mobilization meeting for the start of the plant demolition project as part of the “Disposal of Inventory and Machinery and Equipment Assets Project” was held on the second floor of Yulin Coal Chemical Company’s training center. Xing Xiaofang*, the deputy general manager and chief legal advisor of Yulin Coal Chemical Company, attended the meeting and delivered a speech. The meeting was chaired by Liang Wenyi, deputy general manager of Yutianhua Company, with Guo Zidian, executive director and general manager, delivering an opening speech ; Liu Qing, the project manager of Shaanxi Yingming Hengye Construction Co., Ltd., delivered a speech, and the manager of the demolition project made a statement. The meeting required that, first, a practical \"construction plan\" be developed, relevant registrations be completed, and that plan be strictly followed to ensure \"zero accidents\" throughout the demolition process” ; Secondly, it is necessary to study earnestly the *Work Safety Law* as well as the safety management regulations of Yanchang Petroleum Group and Yulin Coal Chemical Company; organize proper training for those who are responsible for management and operations, clarify the responsibilities of personnel at all levels, and ensure that responsibilities are properly assigned at each stage ; Third, it is necessary to strictly abide by the confirmation system for the “nine types of operations,” particularly regarding the issuance and approval of work permits for 7 categories of operations involved in this project, such as lifting, hot work, and temporary power use ; Fourth, it is necessary to ensure civilized construction throughout the process, take proper measures to control dust and noise, collect and store hazardous waste such as chemical residues and insulating materials, and ultimately dispose of them in a compliant manner ; Fifth, it is necessary to attach great importance to epidemic prevention and control, and strictly implement all relevant measures.
Reply #22021-08-03
It is necessary to properly collect and store hazardous waste such as dust and noise control materials, chemical residue carriers, and insulating rock surfaces, with ultimate disposal being carried out in compliance with regulations;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.