Phase I of the Public Works Island Project in Lianyungang Petrochemical Industry Base
Thread Content
Phase I of the Public Works Island Project in the Lianyungang Petrochemical Industry Base / Author/Source: Huahua Network – Coal Chemicals / Date: 2021-12-01 / Clicks: 6. On November 19, Jiangsu Province officially approved the \"Overall Development Plan for the Lianyungang Petrochemical Industry Base (Revised Version)\”. The approval emphasizes the need to build high-end petrochemical industry chains and industrial clusters, develop high-value-added fine chemical products, and establish world-class large-scale petrochemical industry bases. The total investment exceeds 300 billion yuan. The planned industrial scale includes oil refining capacity of 40 million tons, aromatic compounds production capacity of 7 million tons, and ethylene production capacity of 6 million tons. Simultaneously, various public supporting infrastructure projects will be constructed, including five such projects: public pipelines for the petrochemical complex, public tank farms, petrochemical packaging materials, utility islands, and chemical docks. Phase I of the Public Utility Island Project in the Lianyungang Petrochemical Industry BaseConstructor: Lianyungang Zhongxing Energy Co., Ltd.
Nature of construction: New construction
Location: Within the Lianyungang Petrochemical Industry Base, Xuwei New Area, Lianyungang City
Project investment: 588.283 billion yuan
Construction scale: 3 sets of 2,000 t/d coal gasification units, 1 set of purification units (330,000 Nm3/h of syngas + 80,000 Nm3/h of hydrogen), 2 sets of sulfur recovery units with a capacity of 10,000 tons per year each, 2 sets of air separation units with a capacity of 70,000 Nm3/h each, 1 E-class gas turbine with an output of 126 MW (accompanied by a waste heat boiler), 2 gas boilers with a capacity of 410 th, and 3 coal-fired boilers with a capacity of 440 t/h each (1 in operation and 2 as backups).
http://img.yf116.cn/image/img/20211201/946453520527.jpg
Under normal operating conditions, all three gasification units operate simultaneously, with each unit carrying a load of 100%. The gas turbine generates 112 MW of electricity. The two gas boilers produce 820 t/h of steam (at 100% load), while one coal-fired boiler produces 373 t/h of steam (at approximately 85% load); the other two coal-fired boilers are used as backups. During LGCC maintenance, 3 coal-fired boilers are in operation, each at 100% load. Bid invitation for the procurement of complete air separation plant equipment for Section 2 of Phase 1 of the Public Utility Island project in the Lianyungang Petrochemical Industry Base. Scope of the bid: 2 sets of air separation plants with a capacity of 70,000 Nm3/h each. This includes the design of the process flow for these 2 sets of air separation plants, the manufacturing and supply of the equipment (including air filters, air compressors, boosters, frequency-controlled high-pressure motors, pre-cooling systems, purification systems, cryogenic tank equipment, low-temperature liquid pumps, expanders, backup systems, as well as various electrical and instrumentation devices), technical guidance for the construction of the complete plants, installation guidance, etc.; technical services and after-sales support are also provided. Results of the bidding evaluation for the gasification process package and patented (proprietary) equipment procurement in Section 2 of Phase 1 of the Public Works Island project at the Lianyungang Petrochemical Industry Base: The winning bidder is Ningxia Shenyao Technology Co., Ltd., with a bid price of 80.268 million yuan. Results of the bidding for site preparation work in Section 2 of Phase 1 of the same project: The winning bidder is Lianyungang Xuwei Urban Construction Engineering Co., Ltd., with a bid price of 58.465 million yuan