HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In the first quarter, Jilin Petrochemical Fertilizer Plant worked hard on two fronts to achieve a profit of 59.38 million yuan

2022-04-09View Original

Thread Content

In the first quarter, Jilin Petrochemical Fertilizer Plant managed to achieve a profit of 59.38 million yuan by operating on two fronts. Author/Source: Jilin Daily Date: 2022-04-09 Clicks: 12 This year, despite challenges such as severe cold weather and the COVID-19 pandemic, Jilin Petrochemical Fertilizer Plant managed to earn a total profit of 59.38 million yuan. Building on its successful start in January, the factory continued to optimize its operations and placed strong emphasis on safe production. Especially after the outbreak of the epidemic in Jilin City, the factory strictly complied with all the company’s requirements regarding epidemic prevention and control. More than 400 managers and employees stayed on site to work hard toward achieving success in both epidemic prevention and control as well as safe production. The plant firmly upholds the principles that \"stability is the greatest benefit\" and \"safety comes first, with everything else subordinating to it\". It strictly adheres to the requirements of \"precision in all aspects\", addresses potential hazards promptly, and ensures the safe and stable operation of the facilities. On March 4, the employees in the synthetic ammonia workshop monitored the systems carefully and detected promptly that a control valve had failed and closed. The crew on duty reacted quickly and carried out precise emergency responses, successfully preventing accidents such as a full shutdown of the synthetic ammonia plant or damage to the quenching ring of the gasifier. On March 25, employees in the plant’s ammonia synthesis workshop conducted thorough inspections and discovered a leak at the weld seam before the pressure guiding pipeline valve of the cooling water flow meter in Gasifier No. 1. They reported this issue promptly, and the workshop activated its emergency response plan, quickly ordering the shutdown of Gasifier No. 1 to prevent further accidents. Currently, the oil feeding rate to the ammonia synthesis plant has been increased to full capacity.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.