The gasification phase of the first phase of Ningxia Guanneng New Materials project was completed using Jinhua Furnace 3.0

2023-08-01View Original

Thread Content

Recently, the gasification framework of the polymer, biodegradable materials, and related upstream supply chain project carried out by Ningxia Guanneng New Materials Technology Co., Ltd. using Jinhua Furnace 3.0 (referred to as the “Ningxia Guanneng Project”) was completed – marking another significant milestone in the progress of this project. This achievement lays a solid foundation for the early completion and operation of the project. The technology transfer (patent licensing) contract for this project was signed on December 30, 2022; the process package design documents were delivered in March 2023; civil construction began in May, and the gasification framework was completed in July. This project set the record for the fastest completion of the roof construction in Jinhua’s furnace gasification framework. The project utilizes the water-cooled wall directly-connected waste boiler gasifier technology (Jinhua Furnace 3.0) developed by Beijing Qingchuang Jinhua Technology Co., Ltd. Two Jinhua Furnace 3.0 units are employed (with one as a backup), the gasification pressure is 6.5 MPaG, and the total gas output is 120,000 Nm3/h (CO + H2); bituminous coal is used for gasification. The two Jinhua furnaces (3.0) generate a total of 48 t/h of high-pressure steam at 10.0 MPa as a by-product. Designed by Saiding Engineering Co., Ltd., this project is expected to be completed and put into operation by the end of 2023.
Reply #22023-08-01
Project Overview: Ningxia Guanneng New Materials Technology Co., Ltd.’s projects related to polymer materials such as NMP, PBT/PBAT, and PTEMG, as well as biodegradable materials and the associated upstream supply chain, were established in the Hongyazi Industrial Park of Pingluo County in April 2022. These projects use calcium carbide, gray hydrogen, and green hydrogen as raw materials to produce new polymer materials such as BDO-PBT-NMP-spandex. The project is constructed in three phases, with a total investment of 14.68 billion yuan. Currently, the first phase of the project, which involves an estimated total investment of 3.56 billion yuan and will produce 272,000 tons of BDO and 100,000 tons of PBT, is under construction; it is expected to be completed and put into operation by October this year. The construction of Phase 3 is expected to be fully completed by October 2025. The project utilizes advanced industry technologies and equipment; upon its full completion, it is expected to produce 500,000 tons per year of key raw materials for new energy and new materials. In addition, it will also be capable of producing 120,000 tons of biodegradable plastics, 100,000 tons of electrolytes, and 300,000 tons of spandex. It is estimated that once the project is fully completed, it will generate an annual output value of 23.8 billion yuan and profits and taxes of 5.3 billion yuan, while creating over 2,000 local job opportunities. According to a report from the Shizuishan City News and Media Center in April, the construction of the ductwork, equipment, frameworks, and foundation structures for all sections of BDO’s main plant has now been completed. The first-phase project is scheduled to go into operation in October 2023. On April 28, 2022, Ningxia Lingyun Group signed an agreement with Pingluo County ** to establish Ningxia Guanneng New Materials Technology Co., Ltd. A project for the production of polymer, biodegradable materials, and related upstream industrial chains will be invested in Pingluo County, with the main focus on manufacturing products such as NMP, PBT/PBAT, PTMEG, and spandex. The total estimated investment for the project is 16.71 billion yuan, of which 15.91 billion yuan is for fixed assets. Among them, the estimated fixed investment for Phase 1 is 5.46 billion yuan, while that for Phase 2 is 8.5 billion yuan. The total investment for the 400MW wind and solar power generation project and the 6×5000 m3/h electrolysis hydrogen production project is 1.95 billion yuan. According to the official promotional materials, this project is jointly invested in and developed by Jin Haiyi (**) International, Jiangsu Suneng Investment Group, and Ningxia Lingyun Group. Jin Haiyi provides BDO equipment, Jiangsu Suneng is responsible for sales or modification, while Ningxia Lingyun supplies the raw material calcium carbide – the three parties working together.
Reply #32023-08-05
Impressive, reaching the limit in just two months.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.