Datang Fuxin Coal-to-Natural Gas Project Aims to Begin Operation by the End of October

2026-04-11View Original

Thread Content

Since the full resumption of work on the Datang Fuxin coal-to-natural gas project in October 2025, it has made rapid progress thanks to the joint efforts of all parties involved. According to a report on the Liaoning Provincial Government website in April 2026, at the site of the Datang Fuxin coal-to-natural gas project, over 2,000 workers were working simultaneously at full capacity. The Fuxin coal-to-natural gas project was basically completed in 2020. Resuming operations requires, on the one hand, inspecting and maintaining the installed equipment and instruments ; On the other hand, due to new optimization and technical improvement projects as well as standard upgrades, it is necessary to supplement the original design in accordance with **new safety and environmental protection standards and requirements. The production schedule set by Datang Fuxin is as follows: the boilers in the power center will be ready for ignition by the end of June, the synthesis center will be ready for hot-state testing by September 30, and the project will be operational by the end of October, enabling the delivery of qualified natural gas. The first phase of Liaoning Datang International’s Fuxin project, which produces 1.3 billion cubic meters of natural gas from coal, uses Lurgi coal pulverization pressurized gasification; natural gas is generated through processes such as low-temperature methanol washing, sulfur recovery, and methanation. The first phase of the coal-to-natural gas project at Liaoning Datang International Fuxin officially commenced operations in July 2011. In the second half of 2013, the project was put on hold due to factors such as coal supply, railways, the market, and technology, and construction was officially halted in 2014. In April 2018, work on the project resumed in full. In June 2020, the A/B series of Datang Fuxin were purged, after which operations were suspended. Full resumption of operations in October 2025. The process technology used in the Datang Fuxin coal-to-natural gas project is exactly the same as that of the coal-to-natural gas project in Keshiketeng Banner, Inner Mongolia.
Reply #22026-04-11
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-11
Thermisostatic pressing: One of the most advanced heat treatment and shaping technologies in the world. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717580 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-04-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #52026-04-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #62026-04-15
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-16
【Ten Years of Rapid Development in Chemical Equipment】The world’s first pilot plant for hydrogen metallurgy using green electricity and green hydrogen was put into operation at Ansteel’s Bayuquan production facility from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717808 (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-04-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #92026-04-17
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The Use of Submersible Long-Shaft Pumps for Oil-Contaminated Sewage Pumps in Tank Farm Areas https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717995 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-04-18
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.