Thread Content
On April 17, the integrated project for hydrogen and methanol production as well as SAF production via wind and solar power in Keshiketeng Banner, sponsored by Zhongke Yitan, was approved for registration. The project is located in Baruydumu Gacha, Darhan Ula Sumu, Keshiketeng Banner, Chifeng City, Inner Mongolia Autonomous Region. The project entity is Zhongke Yitan Energy Technology (Chifeng) Co., Ltd. The total investment amounts to 7.5 billion yuan. Construction scale and contents: 1. Construct one set of electrolytic water hydrogen production line, including electrolytic water hydrogen production equipment, gas-liquid separation equipment, purification equipment, etc., with an annual output of 62,500 tons of green hydrogen ; 2. Build a set of green methanol production lines, including biomass gasification equipment, combined purification equipment, methanol synthesis equipment, etc., to produce 500,000 tons of green methanol per year ; 3. Construct one SAF synthesis production line capable of producing 100,000 tons of SAF per year. Planned construction period: May 2026 to December 2028.
【Ten Years of Rapid Development in Chemical Processing Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The gas supply for automated instruments is connected to the instruments without being filtered or pressure-regulated first. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718231 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – No Toxic Gas Detectors Installed at the Sampling Points of Formaldehyde Production Units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718279 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest opening – 8.6-meter molten salt tank-type collector systems and related processes have completed their technical validation: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718280 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The “high-efficiency hydrogen production and hydrogenation integrated unit” technology developed by Dalian Institute of Chemical Physics from 2031 to 2026 passed the evaluation for scientific and technological achievements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718315 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an international leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
[History of Haichuan Chemical] Compilation post -- Observing development through history! Continuously updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3094-2026: Filling the Gap! A breakthrough has been achieved in the large-scale production technology of high-end oxalates in China. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718443 (Source: Haichuan Chemical Forum (HCBBS))