HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Who has the methods and pictures for on-site assembly of tower equipment?

2018-05-14View Original

Thread Content

I would like to know how the tower is transported in sections to the site, how it is assembled, how its verticality is ensured, and how the welding of the cylinder is carried out!
Reply #22018-05-14
There are various methods; mainly, it depends on the connection method at the factory – flange connection or welding. The most common method is welding, which involves installing pendants on three or four sides and welding them at the diagonal points, in order to adjust the position as needed and maintain verticality.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.