Discussion on issues during the commissioning of hydrogen production plants! ! ! ! ! !

2015-08-29View Original

Thread Content

After the pre-sulfurization of the desulfurization system in the dry gas hydrogen production unit is completed, nitrogen is introduced to raise the pressure to 30 kilograms, and then the feed gas is added slowly at a load of around 30%. Once the tests show satisfactory results, the gas can be fed into the conversion system. At this point, the reduction in the conversion system has been completed; it remains in a cyclic state within the conversion system and has reached the feeding conditions, with a pressure of around 10 kilograms. After feeding into the conversion system at this point, does the system continue to cycle until the operating pressure is reached, or does it stop cycling as soon as feeding begins?
Reply #22015-08-29
Cycling begins as soon as feeding starts; if cycling continues, the pressure at the compressor inlet will rise sharply.
Reply #32015-09-12
It is possible to keep the cycle running while allowing partial venting; moreover, the refining desulfurization system should not be integrated into the conversion system all at once. It should be integrated gradually while venting at the same time, otherwise integrating it entirely into the conversion system would cause a sharp drop in the temperature of the conversion furnace, making it difficult to control and resulting in large fluctuations.
Reply #42015-09-23
It’s strange that the nitrogen pressure rises to 30 kilograms, but then drops back to 10 kilograms after feeding begins We enter the raw material catalyst reduction stage, and the cycle is terminated

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.