【Daily Topic】【Civil Engineering Version 20160115】

2016-01-15View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. Multiple-choice question: Regarding the installation of high-strength bolts in steel structures, which of the following statements are correct? A. It should proceed from the area with higher stiffness toward the unrestrained free end. B. It should proceed from the unrestrained free end toward the area with higher stiffness. C. It should start from the middle of the bolt group and work outward, tightening each bolt one by one. D. It should start from the periphery of the bolt group and move inward, tightening each bolt one by one. E. The initial tightening, secondary tightening, and final tightening of high-strength bolts in the same joint should be completed within 24 hours
Reply #22016-01-15
Regarding the installation of high-strength bolts in steel structures, the correct statements are (ac). A. It should proceed from the area with high stiffness toward the unrestrained free end. C. It should start from the middle of the bolt group and work outward, tightening each bolt one by one
Reply #32016-01-15
Regarding the installation of high-strength bolts in steel structures, the correct statements are (ACE). A. It should proceed from the area with higher stiffness toward the unrestrained free end. B. It should proceed from the unrestrained free end toward the area with higher stiffness. C. It should start from the middle of the bolt group and work outward, tightening each bolt one by one. D. It should start from the periphery of the bolt group and move inward, tightening each bolt one by one. E. The initial tightening, secondary tightening, and final tightening of high-strength bolts in the same joint should be completed within 24 hours
Reply #42016-01-15
Regarding the installation of high-strength bolts in steel structures, the correct statements are (A C E). A. It should proceed from the area with higher stiffness toward the unrestrained free end. B. It should proceed from the unrestrained free end toward the area with higher stiffness. C. It should start from the middle of the bolt group and work outward, tightening each bolt one by one. D. It should start from the periphery of the bolt group and move inward, tightening each bolt one by one. E. The initial tightening, secondary tightening, and final tightening of high-strength bolts in the same joint should be completed within 24 hours
Reply #52016-01-15
Regarding the installation of high-strength bolts in steel structures, the correct statements are (A C E). A. It should proceed from the area with higher stiffness toward the unrestrained free end. B. It should proceed from the unrestrained free end toward the area with higher stiffness. C. It should start from the middle of the bolt group and work outward, tightening each bolt one by one. D. It should start from the periphery of the bolt group and move inward, tightening each bolt one by one. E. The initial tightening, secondary tightening, and final tightening of high-strength bolts in the same joint should be completed within 24 hours
Reply #62016-01-15
A, C, E,-------------------------------------------------
Reply #72016-01-15
Regarding the installation of high-strength bolts in steel structures, the correct statements are (ACE). A. It should proceed from the area with higher stiffness toward the unrestrained free end. B. It should proceed from the unrestrained free end toward the area with higher stiffness. C. It should start from the middle of the bolt group and work outward, tightening each bolt one by one. D. It should start from the periphery of the bolt group and move inward, tightening each bolt one by one. E. The initial tightening, secondary tightening, and final tightening of high-strength bolts in the same joint should be completed within 24 hours

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.