The first phase of the coal-to-gas project at Wuhai Jiasheng Energy Company has been basically completed

2016-09-21View Original

Thread Content

The first phase of JiaSheng Energy Company’s coal-to-gas project in Wuhai City has been basically completed. Author/Source: Date: 2016-09-21. Clicks: 10. To address the issue of insufficient production of coke oven gas in the industrial park, Wuhai City actively introduced JiaSheng Energy Co., Ltd.’s coal-to-gas project. To date, the first phase of this project has been largely completed, and it is expected that high-quality, low-cost, clean coal-derived gas energy will be available for production by the end of September. On September 9, reporters at the coal-to-gas project of Jiasheng Energy Company, located in the Xilai Feng Industrial Park in Hainan District, saw that the gas generator and its associated purification and desulfurization equipment had been installed. Workers were welding the pipes for transporting the gas, while the hardening of the site and road construction were in full swing. “The construction work for Phase 1 began last August; equipment installation has now been completed. Individual unit testing, as well as the coordination of equipment within the station and furnace drying, have all been finished, and the facility is ready for gas supply. Currently, work is underway on installing the gas pipelines and conducting pressure tests. ”said Liu Jun, the company’s general manager. Jiasheng Energy Co., Ltd. is a coal-to-gas energy company established through a PPP model by Inner Mongolia Xinja Energy Chemical Technology Co., Ltd. and Wuhai Haisheng Company. The project covers an area of 2.58 hectares; the initial investment was 50 million yuan, during which 3 gas generators with a capacity of 4.2 meters each were built. The facility is capable of producing 350 million cubic meters of high-quality gas per year, as well as processing 120,000 tons of coke particles and coal annually. The gas produced by this coal-to-gas project is different from conventional coke oven gas; the process used in this project employs a two-stage gas generator gasification technology. The so-called two-stage process involves the first stage, in which the main furnace produces gas, which is then sent to the second stage for purification and desulfurization; after that, it is pressurized and delivered to various gas-consuming enterprises within the industrial park. “The gas produced using this manufacturing technology enables continuous feeding and continuous gas production; it not only features high production capacity and low costs but also boasts advanced technology, with a low sulfur content in the gas,” said Liu Jun. “In the first stage of production, the hydrogen sulfide content in the gas reaches 800 ppm, but after purification in the second stage and desulfurization using the wet method, this level can be reduced to below 50 ppm, which meets environmental standards – making it a clean energy source that fully complies with relevant standards.” ” The first phase of Jiaseng Energy Company’s coal-to-gas project converts the coal resources available in Wuhai City into coal gas through scientific and environmentally friendly processes. This provides high-quality, low-cost coal gas energy for the enterprises located in the Xilai Feng Industrial Park in Hainan District, thereby solving the gas supply issues for these companies. “The gas we produce is mainly supplied to 5 enterprises within the industrial park, including Hei Mao Carbon Black, Hei Mao San Xing, Yadong Naphthalene product lines, and Xin Jia New Energy Company. ”Liu Jun said, “At present, the furnace drying phase for the first phase of the coal-to-gas project has been completed. Once the facilities of these downstream enterprises are ready to receive gas supply, we can officially start production.” Next, the company will expand its production in line with the park’s planning. ”The completion of this project not only ensures the normal and stable production of enterprises in the park but also helps to utilize the coke particles produced by coking enterprises, thereby increasing their value.
Reply #22016-09-22
Whose technology is behind those 3 4.2-meter gas generators? A total investment of 50 million is quite low!
Reply #32016-10-07
What stage is the project at now?
Reply #42016-10-18
A 4.2-meter gas generator, upgraded using carbon molecular gasification technology, can increase gas production by 3 times.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.