HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation of air conditioning in the control room

2021-05-27View Original

Thread Content

Can a commercial unit be installed for the air conditioning in the on-site control room? Are there any relevant standards?
Reply #22021-05-27
Sure, as long as you’re not afraid of high costs!
Reply #32021-05-28
To be more specific: for what type of production facility and what kind of control room, what type of air conditioning system is required?
Reply #42021-05-28
The method to be adopted should be determined based on the space and number of individual rooms.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.