HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions regarding the compressor loading and unloading cycles

2022-08-06View Original

Thread Content

In the PLC control of some compressors (such as air compressors and refrigeration units), there are two parameters: the loading cycle and the unloading cycle, measured in seconds. But I don’t know what it means. For example, if the loading cycle is set to 180 seconds, it can be understood as the time taken by the unit to carry out the loading action being 180 seconds, or it can also be interpreted as the loading action being performed every 180 seconds. What exactly does it mean? Do different manufacturers have different meanings?
Reply #22022-08-07
Consulting the manufacturer is the best choice. There are many problems that arise on site; what seem to be technical issues are actually problems related to the communication process. The one who tied the knot must be the one to untie it. For reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.