HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Research Report on Million-Ton Coal-to-Oil Project

2018-12-27View Original

Thread Content

Research Report on the 1 million tons per year coal-to-oil project by the Northwest Energy Regulatory Bureau / Author/Source: Huahua Network – Coal Chemicals / Date: 2018-12-26 / Clicks: 25. To promote the implementation of the \"13th Five-Year Plan for the Development of Advanced Coal Processing Industries,\" the Northwest Energy Regulatory Bureau recently conducted a survey of the development status of coal indirect liquefaction projects at Shaanxi Future Energy Chemical Co., Ltd. (hereinafter referred to as \"Future Energy\"). It inspected the 1 million tons per year low-temperature Fischer-Tropsch synthesis coal indirect liquefaction demonstration project as well as the 100,000 tons per year high-temperature Fischer-Tropsch synthesis coal indirect liquefaction demonstration facility. The bureau exchanged views with the company regarding production and operations, technical processes, overall energy consumption, product structure, product sales, project development plans, as well as the current problems, difficulties, and challenges faced by the coal-to-oil industry. It also listened to the company’s opinions and suggestions on the development of this industry. Article by **Northwest Regulatory Bureau of the Energy Administration**: Project 1 – Construction and Operation Status. The project is located in Yuheng Industrial Park, Yuyang District, Yulin City, Shaanxi Province, and is operated by Future Energy. The future energy project will be established by Yankuang Group, Yanzhou Coal Industry, and Yanjiang Petroleum with equity shares of 50%, 25%, and 25% respectively. The overall plan calls for the development of a project for the efficient and clean utilization of coal to produce 10 million tons per year of oil products and chemicals, in two phases over three steps. To date, the first-phase demonstration project for coal indirect liquefaction via low-temperature Fischer-Tropsch synthesis with an annual capacity of 1 million tons, as well as a demonstration unit for this process using high-temperature Fischer-Tropsch synthesis with an annual capacity of 100,000 tons, have been built and put into operation. Preparatory work is currently underway for the second phase of this project, which involves coal indirect liquefaction via both low-temperature and high-temperature Fischer-Tropsch synthesis with an annual capacity of 4 million tons. Status of the Phase 1 1 million tons/year low-temperature Fischer-Tropsch coal indirect liquefaction demonstration project: This project is part of the **12th Five-Year Plan’s demonstration projects for the deep processing of coal. It covers an area of 303 hectares and is designed to produce 1.15 million tons of petroleum products per year, including 790,000 tons of synthetic diesel, 260,000 tons of naphtha, and 100,000 tons of liquefied petroleum gas; it involves the conversion of 5 million tons of coal per year. Construction of the project began in July 2012; all units were fully completed by June 2015. In August of the same year, the entire production process was operationalized, and the trial run was successful with a single batch of material used. The total investment incurred was 14 billion yuan. To date, the entire project has achieved safe, stable, and long-term operation. The accompanying Jinjitan Coal Mine is located in Yuyang District, Yulin, Shaanxi Province. It has a geological reserve of 1.872 billion tons, with a recoverable reserve of 978 million tons. The main types of coal are long-flame coal and non-caking coal. The coal seams are stably distributed, and the hydrogeological conditions are simple. The coal mine was designed with a capacity of 8 million tons per year; construction began in April 2012 and it came online in July 2014, with a coal washing plant of the same scale being built and put into operation at the same time. In July 2018, the mine’s capacity was increased to 15 million tons per year. The technical level is relatively advanced. The successful operation of this project marked the first time in the country that industrialization of million-ton-scale indigenous coal indirect liquefaction technology was achieved. Technologically, the project relies on Shanghai Yankuang Energy Technology Co., Ltd., utilizing its proprietary 1-million-ton-class low-temperature Fischer-Tropsch synthesis technology and oil stabilization hydrogenation technology. The Fischer-Tropsch synthesis reactor and the oil upgrading unit are among the largest of their kind in China at present. They feature high diesel selectivity, low catalyst consumption per ton of oil produced, high production efficiency in the Fischer-Tropsch synthesis reactor, and high energy utilization efficiency, reaching a level that is \"leading in China and advanced internationally\". The project has also undertaken 5 projects under the **\"863\" Program**, 2 projects under the **\"973\" Program**, obtained 43 patents, and achieved 11 national-level results. The degree of equipment autonomy is high. The main facilities of the project include 4 sets of air separation units with a capacity of 85,000 standard cubic meters per hour, 8 multi-nozzle opposed coal-water slurry pressurized gasification furnaces (6 in operation and 2 as backups) capable of processing 2,000 tons of coal per day, 3 sets of carbon monoxide shift units, 3 sets of low-temperature methanol washing units with a gas handling capacity of 270,000 standard cubic meters per hour, 2 sets of sulfur recovery units, 1 set of Fischer-Tropsch synthesis unit, 1 set of Fischer-Tropsch synthesized oil processing unit, 1 set of exhaust gas hydrogen production unit, 3 high-pressure coal powder boilers with a capacity of 480 tons of steam per hour, and a Fischer-Tropsch synthesis catalyst production facility with an annual output of 3,000 tons. There are over 500 units of large-scale equipment in total. Based on the investment amount, the degree of localization of the equipment used in this project exceeds 82%, while based on the number of equipment units, it is over 92%. The product is of high quality. The project mainly produces diesel, gasoline, olefins, paraffins, lubricating oils, surfactants, high-carbon alcohols, and other chemical products. The oil products manufactured contain no sulfur, nitrogen, or aromatic compounds; the cetane number of light diesel is 81, while that of heavy diesel is 79. The key parameters meet or exceed the Euro V standards. The resource consumption metrics meet the requirements. Operational data show that the project consumes 3.44 tons of standard coal per ton of oil used, 44.57 kwh of electricity, and 7 tons of water; the reuse rate of water reaches 98.26%. The carbon dioxide emissions per ton of oil produced are 4.93 tons, with a carbon conversion rate of 98%–99%. The overall energy utilization efficiency is 45.9%, which meets the requirements regarding energy efficiency and resource consumption set out in the \"13th Five-Year Plan for Advanced Coal Processing\" (see Table 1). Significant achievements have been made in energy conservation and emission reduction. The investment in energy conservation and environmental protection for this project amounted to 1.81 billion yuan, accounting for 11.04% of the total investment. Environmental protection facilities and devices such as sewage treatment, waste gas treatment, noise pollution control, solid waste disposal, gas power generation, and waste heat power generation have been built and put into use; sewage treatment has achieved zero emissions, with the compliance rate for pollutant emissions at 100%. The project makes extensive use of air coolers as cooling devices for turbines and industrial processes, effectively replacing the circulating water cooling method. This approach allows for a savings of 13.49 million cubic meters of fresh water per year in terms of evaporation, with a reuse rate of water resources reaching 98.26%. The project makes full use of waste heat and exhaust gas to generate electricity; it has 3 sets of 50MW waste heat generators and 1 set of 42MW gas generators that are in operation. While meeting the plant’s own power needs of around 80–100MW per hour, it is also able to supply approximately 30–50MW of electricity to the grid, thereby contributing to energy savings and emission reduction. Status of the follow-up project for Phase 1: The 100,000 tons/year demonstration plant for indirect coal liquefaction via high-temperature Fischer-Tropsch synthesis. In June 2017, an industrial demonstration plant for high-temperature Fischer-Tropsch synthesis with a capacity of 100,000 tons was also built as part of the first phase of the project, and its trial operation was successful on September 19, 2018, with a single batch of feedstock used. This is China’s first industrial demonstration plant for high-temperature Fischer-Tropsch synthesis that has been developed independently with full ownership of intellectual property rights. Its completion and commissioning have laid a technical foundation for the construction of million-ton-scale industrial plants in China, and it also signifies that high-temperature Fischer-Tropsch synthesis technology is now fully ready for industrial application. The project mainly consists of two units: high-temperature Fischer-Tropsch synthesis and catalyst reduction. The main raw materials and utility services are provided by the first-phase 1 million-ton coal indirect liquefaction project, while the high-temperature condensates and low-temperature condensates produced by the Fischer-Tropsch synthesis are sent to the first-phase oil processing unit. This technology innovatively employs an iron-based catalyst and a fixed fluidized-bed reactor; the Fischer-Tropsch synthesis takes place at high temperatures, allowing for the generation of high-quality steam at 4.0 MPa, which facilitates the comprehensive utilization of energy and reduces the energy consumption per unit of product. Operational data shows that the reaction temperature in this demonstration unit ranges from 300°C to 370°C; the conversion rate of carbon monoxide exceeds 99%, while the conversion rate of syngas reaches 92%. The carbon number distribution of the synthesized products is relatively narrow, and the olefin content is high. This enables the production of fine chemicals and specialty chemicals that are difficult to obtain through conventional petrochemical routes. The successful demonstration operation of this facility also provided technical validation for the subsequent 4 million tons per year coal indirect liquefaction project in Phase I. 4 million tons per year low-temperature + high-temperature Fischer-Tropsch coal indirect liquefaction project. “During the 13th Five-Year Plan period, building on the 1 million tons per year coal indirect liquefaction demonstration project, a first-phase follow-up project with a capacity of 4 million tons per year for coal indirect liquefaction will be carried out, along with the construction of a related coal mine in Xihongdun with an annual production capacity of 10 million tons. The total investment is estimated at around 83 billion yuan. Large-scale high- and low-temperature Fischer-Tropsch synthesis combined production technologies will be utilized, with two units each for high- and low-temperature Fischer-Tropsch synthesis, and one production line for the 4 million tons per year oil and chemicals processing facility. The core facilities include a 2 million tons per year high-temperature Fischer-Tropsch synthesis demonstration plant and a 2 million tons per year low-temperature Fischer-Tropsch synthesis co-production plant. Further extend the industrial chain and optimize the product structure, while producing 28 high-quality oils such as gasoline, diesel, aviation fuel, and lubricant base oils, as well as chemicals with high added value. By then, an annual coal indirect liquefaction capacity of 5 million tons will be established, making it the largest coal indirect liquefaction facility in the country. Currently, the preliminary work for the follow-up project of Phase 1 is underway; construction is expected to begin in 2019 and completion and operation are scheduled for 2022. 2. Demonstration effect of the Phase I project: The 1-million-ton-per-year demonstration project for indirect coal liquefaction via low-temperature Fischer-Tropsch synthesis in Phase I has demonstrated significant exemplary effects and strong technological leadership. It has facilitated the regional economic transformation and development, laid the foundation for the industrial development of coal-to-oil production, and holds great significance for promoting the development of China’s coal-to-oil industry. We have mastered the complete set of technologies for large-scale indirect coal liquefaction. Through the implementation of this project, Future Energy Company has optimized and integrated various unit technologies such as coal gasification, purification, Fischer-Tropsch synthesis, and oil upgrading. It has also mastered the complete set of technologies for large-scale indirect coal liquefaction, including high-efficiency low-temperature Fischer-Tropsch synthesis catalyst technology and a large-scale low-temperature Fischer-Tropsch process primarily aimed at producing oil products. It possesses the capability to design and manufacture large-scale reactors. During the implementation of this project, a series of challenges were overcome in the design, construction, and installation of large-scale slurry-bed reactors for low-temperature Fischer-Tropsch synthesis; knowledge was gained regarding large low-temperature Fischer-Tropsch synthesis reactors and their internal components. **This contributed to the improvement of the technical skills in welding, heat treatment, forging, and lifting among China’s large chemical equipment manufacturing enterprises. It has improved the levels of project management and construction. The project has initially established a standardized and orderly operation mechanism as well as an effective talent development system; through strict management in terms of schedule control, budget management, quality supervision, and design optimization, it has **improved the levels of project management, construction quality, and investment control. It took only 3 years from the start of construction to completion; the estimated investment was 16.4 billion yuan, while the actual investment amount was 14 billion yuan, resulting in savings of 2.4 billion yuan. This approach ensured high-quality construction, rapid progress, and cost efficiency. Innovated investment cooperation and business operation models. To alleviate the pressures of high investment costs and difficulties in financing for coal-to-oil projects, Future Energy Company has brought in partners to improve the operation and management of its facilities. Among them, the BOT commercial operation model is adopted for the treatment of industrial wastewater; Botian Environment is responsible for its construction and operation ; The air separation unit of this project adopts a third-party gas supply system; it was constructed by the American company AP. The price of oxygen is below 0.3 yuan per Nm3, resulting in low overall operating costs, and the unit boasts significant advantages in terms of operational duration. 3 Problems, Difficulties, and Challenges: At present, the annual production volume of the 1 million tons/year demonstration project for indirect coal liquefaction via low-temperature Fischer-Tropsch synthesis is only 500,000 tons. Although it operates safely, stably, over long periods of time at a certain load level, it has not reached its planned production capacity nor its profit targets. Based on an assessment of the projects that have been completed in China, as of September this year, the country’s coal-to-oil production capacity has reached 9.21 million tons per year, a 214.3% increase since the beginning of the 13th Five-Year Plan period. However, most of these projects operate at a loss. The main reasons for this include limitations in technology and production processes, insufficient development of the industrial chain, the impact of crude oil and coal prices, restrictions imposed by taxes and fees on refined oil products, and changes in China’s energy structure. These issues stem from both external environmental factors and problems inherent to the projects themselves. The coal-to-oil industry is an emerging sector that is still in its initial stages of development, and it faces numerous problems, difficulties, and challenges. Oil, gas, and coal prices have a significant impact on the development of the coal-to-oil industry. Firstly, the supply and demand in the international oil and gas market are currently relaxed, with prices remaining low. The export of low-cost oil and gas products from the Middle East and North America is increasing, which has a significant impact on the coal-to-oil industry ; Second, as the supply-side structural reform in China’s coal industry progresses, coal prices have remained at high levels. This has led to capacity cuts in the coal-to-oil industry, which uses coal as a raw material; in some cases, coal produced by associated coal mines is even sold directly to offset the operational pressures faced by coal-to-oil projects. The adjustment of the energy structure may shrink the development space for the coal-to-oil industry. With the profound adjustment of the international energy supply and demand pattern, the energy structure is shifting toward cleaner and lower-carbon alternatives. Take electric vehicles as an example: global sales of EVs are expected to rise to 11 million units in 2025, 30 million units in 2030, and 60 million units in 2040. China is the world’s largest automotive market, accounting for 30% of global sales. The development of electric vehicles and hydrogen-powered vehicles will undoubtedly trigger a chain reaction. Coupled with the widespread use of non-fossil energy sources, this will further increase the uncertainties surrounding the development of the coal-to-liquid industry. Product costs remain high, and the level of technology and equipment needs to be improved. Firstly, most of the coal-to-oil projects that have been completed or are under construction in our country use indirect liquefaction technology. Among these, the high-temperature Fischer-Tropsch synthesis process is still in the stage of technical validation, while the low-temperature Fischer-Tropsch synthesis process represents the current mainstream technology. Although this technology has become more mature, there is insufficient optimization and integration of the systems, as well as inadequate coordination between the various process units and equipment. At the same time, due to technical and equipment limitations, the coal-to-oil industry chain cannot be fully expanded, which restricts product diversification and results in high costs per ton of oil produced ; Second, the investment costs of coal-to-liquid projects are significantly higher than those of traditional refining projects of similar scale. For instance, the actual investment in Future Energy’s 1-million-ton-per-year indirect coal liquefaction demonstration project reached 14 billion yuan. In contrast, during the same period, the total investment in PetroChina’s 1-million-ton-per-year oil refinery in Tiandong, Guangxi, which is of comparable scale, was just over 300 million yuan. Such high investment levels result in a longer payback period for these projects. The current fuel tax and fee policy has weakened the competitiveness of coal-to-liquid products. The coal-to-oil industry requires high initial investments and has a long period before costs can be recouped, which puts it at a disadvantage in market competition. Under the current tax and fee policies, the coal-to-liquids industry must pay the same consumption tax on refined oil products as the traditional oil refining industry. When international oil prices remain low, raising this consumption tax—aimed at preventing excessive consumption and environmental pollution—only adds to the already heavy financial burden borne by the coal-to-liquids industry during its initial stages of development. Management experience limits the refinement of project operation management. Most of the entities undertaking the demonstration projects come from industries such as coal, power, and traditional chemicals. These enterprises have a long history and need to reassign a large number of employees internally. The demonstration projects have taken on part of this reallocation task; however, these enterprises lack sufficient experience in coal-to-liquid production. At the same time, there is insufficient in-depth research on the technology-intensive and complex coal deep-processing industry, leaving limited experience available for reference in terms of construction and operational management. 4 Suggestions and recommendations: Build confidence, remain unwavering, and pursue development with determination. Although the coal-to-oil industry has faced many difficulties in its development and there are certain uncertainties ahead, we must adopt a perspective centered on **science and technology strategies, energy strategies, and energy structure adjustments, maintain confidence, stay resolute, and pursue its development unswervingly. Firstly, developing the coal-to-oil industry is a strategic necessity for our country. China’s resource structure characterized by abundant coal and scarce oil, its heavy reliance on imported crude oil, and the urgent need for clean coal utilization all dictate that China must develop coal-to-oil technology. Meanwhile, this industry can drive regional economic transformation and the development of related technologies and equipment manufacturing industries, thereby continuously enhancing China’s level of technological innovation and enabling the country to gain a competitive edge and take the lead in this field. Secondly, international and domestic experience shows that the coal-to-oil industry has great potential to develop high-end fine chemicals through the extension of its industrial chain. The coal-to-oil project in Saso, South Africa, has been able to maintain strong profitability thanks to its abundant supply of high-end specialty chemicals, while the 160,000 tons per year coal-to-oil project in Yitai, Inner Mongolia, has achieved good profits by extending its industrial chain. Implement the plan, strictly control production capacity, and proceed in an orderly manner. Strictly implement the “13th Five-Year Plan for Demonstration Projects in the Deep Processing Industry of Coal”. Prioritize demonstration projects; determine the pace of industrial development based on the progress of technological development. Fully leverage the leading role of these demonstration projects, strictly control entry criteria, and rigorously limit the expansion of production capacity. At the same time, it is necessary to strengthen supervision during and after project implementation, regulate the order of project construction, and prevent phenomena such as approving projects on a smaller scale than intended and experiencing delays in progress. Independent innovation, adherence to standards, and green development. First, it is necessary to implement the innovation-driven development strategy, regarding independent innovation as the primary driving force for the sustainable development of the coal-to-oil industry. Efforts should be made to strengthen original innovation, integrated innovation, and innovation through the introduction, adaptation, and further development of external technologies. Through technological innovation and industrial testing, the process technologies for high-value-added products can be improved. An industrial model that combines high- and low-temperature Fischer-Tropsch synthesis should be developed in order to extend the value chain of fine chemicals and broaden their market prospects ; Second, it is necessary to adhere to high standards, strict requirements, and a high level of ambition, striving to surpass others in terms of construction, scale, production, management, and efficiency, thereby continuously enhancing competitiveness as well as the conversion rate and efficiency of coal ; Third, resource and environmental carrying capacity are taken as prerequisites for industrial development; efforts are made to strengthen ecological and environmental protection, give equal importance to planning environmental impact assessments and environmental impact assessments for construction projects, enforce strict environmental protection standards, and strive to achieve green development. Policy support to promote industrial development. First, summarize successful practices and develop industry standards for safety, production, quality, environmental protection, etc., to promote improvements in project construction, technology, products, and the industry as a whole ; Secondly, **policies should be introduced to provide appropriate subsidies for coal-to-oil products in order to encourage the development of new industries; the oil product storage system should be improved by including coal-to-oil products in the **oil storage catalogue, thereby enhancing the emergency response capacity for oil and gas reserves** ; Thirdly, in response to the challenges faced by the coal-to-oil industry at present, a consumption tax specific to this industry has been introduced; such tax is exempted when crude oil prices are below a certain level. When crude oil prices rise, a tiered taxation system can be implemented based on the overall profitability of the coal-to-oil industry, thereby enhancing its adaptability in the market ; Fourth, in line with the coal-to-chemicals integration model, coal resources sufficient for production needs are provided for coal-to-oil projects, ensuring a stable supply of raw materials for coal-to-oil production and reducing the risks associated with fluctuations in the coal market ; Fifth, draw on the experience of electricity market reform to advance reforms in the oil and gas sector and promote market-based trading of coal-to-oil products. A comprehensive approach should be adopted to formulate policies that allow coal-to-oil enterprises to apply for qualifications for the wholesale and retail of refined oil products, as well as for the construction and operation of oil storage and transportation facilities and gas stations, in order to reduce costs for both parties involved in these transactions. Strengthen industry regulation to promote the healthy development of the sector. First, it is necessary to regulate the operational supervision of coal-to-oil projects by setting strict requirements for coal conversion rates and a maximum limit on the volume of coal that can be sold directly. This will prevent associated coal mines from being driven by profit motives to sell large quantities of coal externally. Furthermore, a comprehensive financial assessment of the coal-to-liquid project (including its supporting coal mines) is conducted to evaluate the overall financial condition of the project ; Second, standardize the sales channels for coal-to-oil products, and punish market-distorting practices such as local refineries mixing coal-to-oil products with other materials to improve their quality before selling them ; Third, a assessment mechanism for coal-to-oil projects should be established, whereby aspects such as the construction timeline, scale, technological advancement, degree of domestic equipment use, operating costs, profits, and environmental protection are evaluated one by one, in order to promote the standardized and healthy development of the coal-to-oil industry.
Reply #22019-01-01
May I have your contact information? I’d like to learn more details about Fischer-Tropsch synthesis
Reply #32019-01-02
Posting a message doesn’t necessarily make one an expert; it’s better to look up more information and learn from it

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.