HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The gasification framework for the Binzhou chemical project along the Wei River has been poured

2019-05-16View Original

Thread Content

Concrete pouring for the gasification framework of the Weihé Binzhou Chemical Project completed Author/Source: Compiled and published by Sinochem 13th Construction Company, Nitrogen Fertilizer and Methanol Technology Network Date: May 15, 2019 Views: 26 Recently, the concrete pouring for the eighth floor (47.37 meters high) of the gasification framework of the ethylene glycol project at the Weihé Binzhou Chemical Project in Shaanxi, which was constructed by the second branch of Sinochem 13th Construction Company, was successfully completed. This facilitates the subsequent lifting of the gasification furnace. The construction site for the 300,000 tons per year coal-based ethylene glycol production facility of Shaanxi Weihe Binzhou Chemical Co., Ltd., which is part of the Shaanxi Coal Chemical Weihe Group, is located within the Xinminyuan Modern Coal Chemical Industrial Park in Bin County. The project covers an area of 600,000 square meters. In April 2016, Shaanxi Weihe Binzhou Chemical Co., Ltd. signed a CTEG technology licensing agreement and an engineering design contract for a 300,000 tons per year coal-based ethylene glycol project with Gaoxuehua and Donghua Engineering. The original owner of the project was Shaanxi Binchang Mining Group Co., Ltd. On November 19, 2014, the 300,000-ton coal-to-ethylene glycol project of Binchang Mining Group was officially transferred to Shaanxi Weihe Coal Chemical Group Co., Ltd. The project construction includes the main facilities such as gasification units, purification units, and ethylene glycol synthesis units, as well as auxiliary facilities for water supply and drainage, desalination stations, power supply, heating, and fire protection. It also encompasses storage and transportation systems, as well as environmental protection measures such as waste gas treatment, wastewater treatment, and solid waste disposal. Upon completion, the project will have an annual production capacity of 300,000 tons of ethylene glycol; the by-products will include 17,576 tons of crude DMC per year, 5,336 tons of DMO reconstituted components per year, 5,920 tons of fusel oils per year, 13,440 tons of light fractions per year, 6,048 tons of heavy fractions of ethylene glycol per year, and 4,321.6 tons of sulfur per year. The total investment for the project is 5.495 billion yuan, of which 444 million yuan is allocated to environmental protection measures.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.