HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

General contract for the polymethoxymethane project at Yulin Energy Chemicals, Yanzhou Coal Industry signed

2019-06-12View Original

Thread Content

The general contract for the polydimethyl ether project at Yanzhou Coal Industry Yulin Energy Chemical was signed. Author/Source: Yaha Coal Chemical Industry. Date: June 12, 2019. Clicks: 27. On June 11, a ceremony to sign the general contract for the design, procurement, and construction of the project to produce 500,000 tons per year of polydimethyl ether (with an initial production capacity of 100,000 tons per year) at Yanzhou Coal Industry Yulin Energy Chemical Co., Ltd., was held in the Hualu Building. Leaders such as Wang Hai, Secretary of the Party Committee and Chairman of the company, Kang Jianbin, Deputy Secretary of the Party Committee and General Manager, Jin Fangyu, Secretary of the Party Committee, Chairman, and General Manager of Yanzhou Coal Industry Yulin Energy Chemical Co., Ltd., and Cao Jinseng, Chief Engineer, attended the meeting. Yanzhou Coal Industry Yulin Energy Chemical is an important strategic partner of Hualu Technology, and the two parties have maintained a good cooperative relationship for a long time. This project collaboration represents full recognition by Yanzhou Coal Industry Yulin Energy Chemical of the efforts that Hualu Technology has made over the years on projects for Yankuang Group. Hualu will provide high-quality engineering services in return for the trust and support given by Yankuang Group and Yulin Energy Chemical, thereby laying the foundation for more in-depth and extensive cooperation between the two parties. Jin Fangyu expressed his gratitude to Hualu Technology for its years of support to Yankuang Group and Yulin Energy Chemicals. Yanzhou Coal Industry Yulin Energy Chemicals shares a deep friendship with Hualu. The DMMn project carried out through this cooperation poses new tests and challenges for both parties. It is hoped that Hualu Technology will organize the work carefully and carry out it in a scientific manner, making full use of the company’s advantageous resources to ensure the successful completion of the project and its timely commissioning. Under the witnesship of leaders from all parties, Wang Hai and Jin Fangyu signed the general contract for project management on behalf of their respective sides. The 500,000 tons per year DMMn (polymethoxydimethyl ether) project of Yanzhou Coal Industry Yulin Energy Chemical Co., Ltd. is scheduled to require a total investment of 4.596 billion yuan. In this project, coal is used to produce polymethoxydimethyl ether through methanol synthesis; the main technologies employed include coal gasification, raw gas purification, methanol synthesis, methanol distillation, sulfur recovery, and DMMn production. Its main products are methanol and DMMn (full name polymethoxydimethyl ether, an ideal new component for diesel blending, and which can also be used directly as a non-aromatic, environmentally friendly solvent) ; By-products include sulfur, liquid oxygen, liquid argon, etc. The project uses one oxygen generation unit with a capacity of 92,000 Nm3/h ; Gasification is carried out using the multi-nozzle (opposed-type) water-coal slurry gasification technology owned by Yankuang Group, with a total effective gas production capacity of 240,800 Nm3/h. Three gasifiers with a capacity of 2,000 t/d each are installed (2 with quenching systems and 1 with a semi-waste boiler), operating in a 2-on-1-backup configuration ; The purification unit uses the Dalian University of Technology low-temperature methanol washing process ; Methanol synthesis utilizes technology from East China University of Science and Technology ; Distillation utilizes the Tianjin Beiyang five-column methanol distillation technology, with a processing capacity of 5,000 tons per day in total. The DMMn plant utilizes Metada’s DMMn technology, and its construction is carried out in two stages: first, a plant with an annual production capacity of 100,000 tons is built, followed by the construction of a plant with a capacity of 400,000 tons.
Reply #22019-06-13
With an annual production capacity of 100,000 tons of dimethyl ether in the first phase, who would still pursue a project of such scale?
Reply #32019-06-13
Methoxydimethyl ether and dimethyl ether are not the same thing, right?
Reply #42024-10-02
We are also in the process of finding out; our organization wants to get involved as well, and we are currently conducting research
Reply #52024-10-03
Conduct more research, gather more information, and make decisions carefully.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.