HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The synthesis gas scrubber tower for the comprehensive utilization project of coking oven gas in Huaibei was successfully hoisted into place

2020-10-30View Original

Thread Content

The syngas washing tower for the comprehensive utilization project of coking oven gas in Huaibei was successfully hoisted into place. Author/Source: Sinochem Second Construction Co., Ltd. Date: October 30, 2020. Clicks: 23. On October 23, the syngas washing tower of the gasification unit in the comprehensive utilization project of coking oven gas at the Henan branch was successfully hoisted into place. The tower is 26.65 meters tall, 4 meters in diameter, and weighs 230 tons. It was lifted using a 750-ton crawler crane for the main lifting operation and a 280-ton crawler crane for assisting with the lift; the lifting height was 36 meters, allowing it to be lowered from the top of the 32-meter-high gasification frame to a position at 9.3 meters. The lifting and installation of this equipment marks the official start of the project’s installation work.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.