Public Notice on the Completion Inspection for Environmental Protection of the Carbon-4 Comprehensive Utilization Transformation Project of Shandong Yangmei Hengtong Chemical Co., Ltd
Thread Content
Public Notice on the Completion Inspection for Environmental Protection of the Carbon IV Comprehensive Utilization Transformation Project of Shandong Yangmei Hengtong Chemical Co., Ltd. Author/Source: Shandong Yangmei Hengtong Chemical Co., Ltd. Date: 2021-11-01 Clicks: 18 I. Basic Project Information Project Name: Carbon IV Comprehensive Utilization Transformation Project of Shandong Yangmei Hengtong Chemical Co., Ltd. Location: No. 327, Renmin Road, Tancheng County, Linyi City. Project Scope: Construction of one set of olefin cracking (OCP) units along with associated tank areas, utilizing existing utility systems and storage and transportation infrastructure. The project produces 55,274.5 tons of pyrolysis gas (mainly containing ethylene and propylene) per year, 4,257 tons of C4+, and 8,553.6 tons of C6+ per year. II. Basic Information of the Construction UnitName of the construction unit: Shandong Yangmei Hengtong Chemical Co., Ltd.
Address: No. 327, Renmin Road, Tancheng County, Linyi City
III. Basic Information of the Inspection and Testing Unit
Name of the inspection and testing unit: Qingdao Zhongbo Huake Testing Technology Co., Ltd.
Address: No. 58, Qinglong River, Huangdao District, Qingdao City
Contact person: /
Phone: 0532-87075277
Email: /
IV. Inspection Conclusion
1. This project has complied with the environmental protection laws and regulations applicable to construction projects, and all necessary environmental approval procedures have been fulfilled. The requirements for pollutant control and various environmental protection measures specified in the environmental impact assessment and the corresponding approvals have been largely implemented, and all environmental protection facilities operated stably and normally during the acceptance monitoring period. 2. During the acceptance monitoring period, the production rate should reach over 75%, satisfying the requirements for acceptance monitoring. 3. During the monitoring period, the waste gas, wastewater, and noise generated by this project were all discharged in compliance with the specified standards; all solid waste was properly disposed of and not released outside the facility. The monitoring results of environmental air, surface water, groundwater, and soil quality all meet the relevant requirements. 4. Based on the acceptance monitoring and on-site investigations conducted this time, the C4 comprehensive utilization transformation project of Shandong Yangmei Hengtong Chemical Co., Ltd. has essentially implemented the pollution control measures and various requirements specified in the environmental impact assessment approval, meeting the acceptance criteria. V. Period of public announcement: The public announcement period is 20 working days, from October 23, 2021, to November 23, 2021. The public can provide valuable feedback on the environmental protection efforts of this project through email, letters, phone calls, and other means.