HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

All equipment installation for future energy projects will be completed on schedule

2021-11-02View Original

Thread Content

The equipment installation for the Future Energy project was completed on schedule. Author/Source: Beijing Petrochemical Engineering Co., Ltd. Date: 11-01-2021. Clicks: 23. Recently, with the installation of the last air cooler completed, all the equipment for the LPG sub-project of Future Energy in Shaanxi, which was overseen by Beijing Petrochemical Engineering Co., Ltd., has been installed. It created favorable conditions for the subsequent construction of pipelines and electrical and instrumentation systems. It is reported that the project covers a small area, with limited construction space, which affects the installation work. The project team actively communicated and discussed the construction plan on multiple occasions with the client, the construction contractor, and the suppliers, scientifically optimizing the installation processes to ensure construction quality and schedule adherence. This project primarily involves the separation and purification of liquefied petroleum gas produced by oil refining units, thereby enabling the production of products with high market competitiveness such as propylene, propane, and C4 fractions. The processing capacity of the facility is 114,100 tons per year.
Reply #22021-11-03
That’s amazing; the results of what was done yesterday are visible right away. Like it!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.