Thread Content
On March 19, the synthesis and distillation facility for producing 200,000 tons per year of green methanol as part of the Huadian Horqin Right Front Banner wind-solar hydrogen production integrated project (hydrogen production and green methanol production sections) was approved for operation. It is understood that the total investment in this project amounts to 2.71335 billion yuan. The construction site is located in the Xing’an League Economic and Technological Development Zone, with the planned construction period running from November 2026 to December 2028. Construction scale and scope: The area required for hydrogen production and green methanol production is approximately 518 mu. A new 220kV hydrogen reduction substation will be built, with an electrolysis capacity of 5.4*10,000 Nm³/h for hydrogen production; the hydrogen storage capacity will be around 570,000 Nm³. There will also be biomass gasification units, auxiliary utility systems, as well as facilities for the synthesis and distillation of 200,000 tons of green methanol per year.
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Equipment Guessing Game】==What a big ice cream! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716191 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial plant for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process was put into commission at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for electricity generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: A period of 15 years! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful pilot testing of Dongfang Electric’s natural gas-ammonia combustion technology from 2032 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】--How to open and maintain valves that are crowded together? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716525 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3053–2026: China’s first 100-kilometer-long carbon dioxide transmission pipeline – the million-ton-scale CCUS carbon dioxide pipeline in the Shengli Oilfield has been operating smoothly for 1,000 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716490 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Completion of China’s first self-developed 1500kN intelligent positioning winch system integration, 3055–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716494 (Source: Haichuan Chemical Industry Forum (HCBBS))