Thread Content
Chengda Company – Xinjiang Zhongtai Jinhui Technology Co., Ltd.: Tender Announcement for Temporary Facilities for the Project of a 300,000-ton-per-year BDO Production Facility and Associated Infrastructure. Author/Source: Date: 2022-02-28. Clicks: 9. *1. Procurement Conditions: The funding for the project of a 300,000-ton-per-year BDO production facility and associated infrastructure by China Chengda Engineering Co., Ltd. and Xinjiang Zhongtai Jinhui Technology Co., Ltd. has been secured; thus, the conditions for tendering the temporary facilities for this project are met*. The tenderer is China Chengda Engineering Co., Ltd., and a public tender is now being conducted for procurement. 2. Procurement Content and Scope 2.1 Procurement content and scope of this project: (1) Lot (package) number: E21059-CT-001/01; Lot (package) name: Chengda Company – Xinjiang Zhongtai Jinhui Technology Co., Ltd.’s 300,000-ton per year BDO production facility and associated facilities project – Temporary facilities – Lot 01. Procurement content and scope: Temporary offices, enclosed warehouses, storage areas, etc., along with related auxiliary facilities. 2.2 Planned duration: 45 calendar days. 2.3 Construction location: New industrial park area in Baicheng County, Aksu Region, Xinjiang. 2.4 Requirements for construction quality and safety: See the tender documents for details. 2.5 Other: 3. Qualification requirements for bidders 3.1 Qualification requirements for bidders – A general contracting qualification for housing construction projects at level 3 or above is required ; China Chengda Xinjiang Zhongtai Jinhui BDO project is on the list of approved subcontractors. 3.2 Bidders shall not fall under any of the following circumstances: (1) Being the same person as the person in charge of another bidder for this project. (2) There is a direct controlling relationship with other bidders for this project. (3) Having a management relationship with other bidders for this project. (4) There have been the following serious adverse circumstances in business operations over the past three years: ① Being suspended, disqualified from bidding, or prohibited from participating in procurement activities by the industry regulatory authorities at or above the provincial level where this project is located, in accordance with the law. ②It is in a state where it has been ordered to suspend operations, have its license temporarily seized or revoked, its permits temporarily seized or revoked, or its qualification certificates revoked. ③Entering liquidation proceedings, being declared bankrupt, or encountering other circumstances that result in an inability to fulfill obligations. ④According to the company’s management requirements, those who are prohibited from participating in procurement activities and whose restrictions are still in effect. 3.3 Whether consortia are accepted for this project: Yes/No 4. Registration, login (Please log in) 5. Procurement application: Is a procurement application required? No/Yes 5.1 Application period: From 2022-02-28 09:00 to 2022-03-07 16:00 (Beijing time)* 6. Acquisition of procurement documents 6.1 Time of acquisition: From 2022-02-28 09:00 to 2022-03-07 16:00 (Beijing time)