HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Bid Invitation for the Construction of the Emergency Command Center and the Intelligent Control Center for Synthesis and Urea at Luzhou Tianhua Chemical Co., Ltd

2022-05-12View Original

Thread Content

Bid Invitation for the Construction Project of Lutianhua Co., Ltd.’s Emergency Command Center and Intelligent Control Center for Synthesis and Urea Production. Author/Source: Date: 2022-05-12. Clicks: 10. Chapter 1: Bid Invitation (No prequalification required). Bid Invitation for the Construction Project of Lutianhua Co., Ltd.’s Emergency Command Center and Intelligent Control Center for Synthesis and Urea Production (Name of the bidding project); Bid Invitation for the Construction Project of Lutianhua Co., Ltd.’s Emergency Command Center and Intelligent Control Center for Synthesis and Urea Production (Name of the bid section) – First round of bidding. 1.1 Project name: Construction Project of Lutianhua Co., Ltd.’s Emergency Command Center and Intelligent Control Center for Synthesis and Urea Production. 1.2 Investment project: Unified code. 1.3 Project owner: Sichuan Lutianhua Co., Ltd. 1.4 Bid issuer: Sichuan Lutianhua Co., Ltd. 1.5 Name of the authority responsible for project approval, authorization, or registration: Naxi District Economic Information, Science and Technology Bureau, Luzhou City. 1.6 Name and reference number of the approval, authorization, or registration document (please log in). 1.7 Source of construction funds: Funded by the enterprise itself. 1.8 Percentage of funding contributed by the enterprise: 100%. 1.9 Bidding method: Open bidding. 1.10 Tendering organization method: Self-tendering. Entrusted bidding 2.1 Location of construction: The premises of Sichuan Lutianhua Co., Ltd., in Naxi District, Luzhou City, Sichuan Province. 2.2 Scale of construction: The floor area of the integrated cabinet room is 194.25㎡, the floor area of the intelligent control center for synthetic ammonia and urea production is 935.25㎡, and the floor area of the emergency command center is 519.75㎡. Note: Fill in the information regarding project cost, functional category, area, height, span, capacity, etc. 2.3 Planned duration: The total planned duration is 60 calendar days. Planned start date: 2022-06-15. Planned completion date: 2022-08-13. Planned completion date: 2022-08-13. 2.4 Scope of the tender: All construction tasks specified in the construction drawings for this project, any supplementary documents (if any), the tender documents, and the bill of quantities, including the list of high-risk construction tasks for this project as outlined in Article 7 of Ministry of Housing and Urban-Rural Development Order No. 37. 3.1 Specific number of bids that can be submitted: All bidders may submit bids for all lots of this tender project, but the number of contracts they can win shall not exceed one lot. 3.2.1 Name of the project section: Construction project of the Emergency Command Center, as well as the Intelligent Control Centers for synthesis and urea production at Luzhou Tianhua Chemical Co., Ltd. 3.2.2 Registration requirements: The applicant must be a corporate entity with legal status within the People’s Republic of China. It has legal person status within the People’s Republic of China. Others: / 3.2.3 Requirements for qualification level: The entity must have the status of an independent legal person, possess a construction project general contracting qualification of level 3 or higher issued by the relevant construction administration department, and have the necessary capabilities in terms of personnel, equipment, and funding to carry out construction work. For regions where the reform of separating licensing from certification has been approved by the State Council, and where the approval process for relevant qualifications is abolished, replaced by a filing procedure, or where a system based on declarations and commitments is fully implemented, the **relevant regulations shall apply. 3.2.4 Performance requirements are specified in the tender documents. 3.2.5 Requirements for construction capabilities in terms of personnel, equipment, funds, etc. are specified in the tender documents. 3.2.6 Consortium bidding? Not accepted □ Accepted, subject to the following requirements: / The qualifications of the consortium must comply with relevant laws and regulations, and shall be assessed in accordance with the division of roles specified in the consortium agreement. In the case of a consortium bid, the credit rating of the consortium is determined based on the lowest credit rating among the members of the consortium as published on the website of the Luzhou Municipal Bureau of Housing and Urban-Rural Development. In other words, if a consortium consists of two or more members, its credit rating will be that of the member with the lowest credit rating. If the credit rating of a consortium member cannot be found on the website of the Luzhou Housing and Urban-Rural Development Bureau, its credit rating is assumed to be grade C. 4.1 Obtaining the tender documents The deadline for submitting tender documents (hereinafter referred to as the tender deadline) is 09:30 on 2022-06-07*

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.