Operation of the gasifier in the world’s largest coal-to-natural gas project currently in use sets a new industry record

2025-08-07View Original

Thread Content

【Luchi Furnace】The gasifier of the world’s largest operational coal-to-natural gas project has set another industry record in terms of operation efficiency! 2025-08-06 On August 5, the Datang Keqi Coal-to-Natural Gas Project, the world’s largest operational coal-to-natural gas facility, achieved a breakthrough in its operation: the gasification unit used in this project was able to operate continuously and stably for a maximum period of 355 days, setting a new record for such technologies in the industry. It is reported that, in order to ensure the stable, efficient, and optimal operation of its gasification furnace systems, the company formed specialized technical teams in collaboration with domestic research institutions and industry partners. Based on the reaction mechanisms of low-grade lignite as raw material and the actual conditions of project operation, it developed an integrated optimization technology framework for gasification furnaces. By implementing innovative improvements such as optimizations to the furnace grates and filler sealing systems, the company successfully overcame 6 industry-related technical challenges falling into 3 categories, which hindered the efficient coordinated and integrated operation of the gasification furnace systems. At the same time, the company has introduced innovative operation manuals such as the \"Standardized Operation Plan for Gasification Furnaces,\" to establish a \"trinity\" process control system. It has also set up a dynamic response mechanism featuring \"24/7 monitoring, analysis, early warning, and adjustment,\" thereby enhancing the overall stability of plant operations. The first phase of the coal-to-natural gas project in Keqi, Inner Mongolia, operated using Lurgi coal pulverization pressurized gasification, partial shift, and DAVY methanation processes. Designed to produce 1.33 billion cubic meters of natural gas per year. It came online in December 2013. Phase 2 also uses Lurgi reactors, which produce not only natural gas but also methanol and ethylene glycol. At the end of October 2023, the second-phase facility began producing qualified natural gas. In August 2024, the entire second phase was put into operation.
Reply #22025-08-07
【Ten Years of Rapid Development in Chemical Equipment】The domestically produced large-scale sulfur recovery unit burners were successfully put into use from the start in Sinopec Zhenhai Refining & Chemical’s second-phase 150,000-ton/year sulfur recovery project. https://bbs.hcbbs.com/thread-5698240-1-1.html (Source: Haichuan Chemical Forum)
Reply #32025-08-07
【History of Haichuan Chemical】Fushun Petroleum Plant No. 1: The Light of Energy in the Old Industrial Base of Northeast China https://bbs.hcbbs.com/thread-5698260-1-1.html (Source: Haichuan Chemical Forum)
Reply #42025-08-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first hydrogen internal combustion engine vehicle was put into trial operation in Cang from 2595 to 2025. https://bbs.hcbbs.com/thread-5698347-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-10
【Ten Years of Rapid Development in Chemical Equipment】2597–2025: Breaking the “material bottleneck” in the display industry chain; China’s first production line for optical-grade MS resin goes into operation https://bbs.hcbbs.com/thread-5698436-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-08-11
【Frontiers of HaiChuan Chemical Technology】Application of space green energy heating technology in heat storage heat exchange devices for crude oil transportation in oil fields https://bbs.hcbbs.com/thread-5698484-1-1.html (Source: HaiChuan Chemical Forum)
Reply #72025-08-12
【Ten Years of Rapid Development in Chemical Equipment】2599–2025: Overcoming Global Technical Barriers; Sinopec’s self-developed polypropylene catalyst unit achieved successful operation on its first attempt https://bbs.hcbbs.com/thread-5698533-1-1.html (Source: Haichuan Chemical Forum)
Reply #82025-08-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful sea trials of 2600-2025 carbon dioxide direct capture from the ocean technology https://bbs.hcbbs.com/thread-5698544-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #92025-08-12
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest single-unit acetic acid production facility, with a capacity for one series of production, was put into operation in Hami from 2602 to 2025. https://bbs.hcbbs.com/thread-5698566-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-08-13
【Ten Years of Rapid Development in Chemical Equipment】China’s first hydrogen production project using pressure swing adsorption (PSA) technology for coke oven gas was successfully put into operation from 2023 to 2025. https://bbs.hcbbs.com/thread-5698597-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.