Hubei Xiangyang Liantou Phosphorus, Coal and Fluorine Industry Xiangyang Base Project (Phase I)

2025-11-05View Original

Thread Content

Project Name: Hubei Liantou Phosphorus, Coal, and Fluorine Industry Xiangyang Base Project (Phase I)
Launch Date: November 04, 2025
Location: Hubei Province
Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Synthetic Materials
Project Owner: Hubei Huangmailing Holding Group Co., Ltd.
Total Investment: 1,200,000 million yuan
Current Progress: Tendering for management services
Construction Location: Yicheng Fine Chemical Industrial Park, Yicheng City, Xiangyang City, Hubei Province
Project Details: Phase I of the project covers an area of approximately 3,000 mu. Milestone: November 01, 2025 – Announcement for the procurement of services related to the preparation of an energy efficiency assessment report for the first phase of the Hubei Liantou Phosphorus, Coal, and Fluorine Industry Project in Xiangyang (energy conservation and water conservation tender). November 01, 2025 – Announcement for the procurement of services related to the preparation of a safety pre-assessment report for the first phase of the same project (management service tender). November 01, 2025 – Announcement for the procurement of services related to the preparation of an environmental impact assessment report for the first phase of the project (management service tender). November 01, 2025 – Announcement for the procurement of services related to the preparation of a pre-assessment report on occupational health hazards for the first phase of the project (management service tender)
Reply #22025-11-05
【Ten Years of Rapid Development in Chemical Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-05
【Ten Years of Rapid Development in Chemical Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-05
【Ten Years of Rapid Development in Chemical Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-05
【HaiChuan Discussion】The client’s demands are getting higher and higher, while the prices kept being pressed lower. Can such work still pass the acceptance test? https://bbs.hcbbs.com/thread-5704576-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The first commercial ammonia-to-hydrogen production facility in China with a capacity of 1,000 kilograms was officially commissioned in Foshan between 2027 and 2025 – the Fuda Zijin facility. https://bbs.hcbbs.com/thread-5704478-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The core equipment for China’s first 400,000 tons/year LAO production facility – the high-purity C4 and C6 product towers – was accepted in Dalian. https://bbs.hcbbs.com/thread-5704530-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-07
【Ten Years of Rapid Development in Chemical Processing Equipment】The first 6MPa 3,500-ton gasification furnace developed as part of the Space Long March project was successfully ignited during the pilot operation of the integrated project for clean and efficient utilization of resources in Xinjiang’s Zhongneng Lvyuan area. https://bbs.hcbbs.com/thread-5704592-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-11-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful trial production of HE700M high-strength, extra-thick welded H-beams by Shansteel Co., Ltd. from 2024 to 2025 https://bbs.hcbbs.com/thread-5704594-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #112025-11-08
【Ten Years of Rapid Development in Chemical Equipment】The key technology project for \"converting coal into high-end carbon materials\" carried out by Zhaoqing Shunxin from 2005 to 2025 has passed evaluation. https://bbs.hcbbs.com/thread-5704595-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.