HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Projects such as Sanmei’s thousand-ton fourth-generation refrigerant production are set to be approved

2026-03-20View Original

Thread Content

On March 16, the pilot plant project (Phase I) of Zhejiang Sanmei Chemical Co., Ltd. in the New Materials Industrial Park of Wuyi County is set to be approved. The details of the project are as follows: Project name: Pilot Plant Project (Phase I) in the New Materials Industrial Park of Wuyi County; Constructor: Zhejiang Sanmei Chemical Co., Ltd; Construction location: Wuyi County New Materials Industrial Park ; Project investment: 63 million yuan ; Construction nature: Expansion ; Construction scale: Upon implementation of this project, one pilot plant will be built for the production of 1,000 t/a of 2,3,3,3-tetrafluoropropene (HFO-1234yf), one pilot plant for 200 t/a of 1,1,1,3,3-pentachloropropane (HCC-240fa), one pilot plant for 200 t/a of 1,1,1,3-tetrachloropropane (HCC-250fb), one pilot plant for 1,000 t/a of 1-chloro-3,3,3-trifluoropropene (HCFO-1233zd) and 500 t/a of 1,3,3,3-tetrafluoropropene (HFO-1234ze(E)), one pilot plant for 1,000 t/a of 2,3,3,3-trifluoropropene (HFO-1243zf), one pilot plant for 200 t/a of perfluorohexanone and one pilot plant for 100 t/a of hexafluoropropylene trimer, as well as one pilot plant for 150 t/a of dichlorodifluoroethane (HCFC-142b).
Reply #22026-03-20
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-03-20
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-03-21
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2030 to 2026, China’s first ultra-large-diameter (nominal diameter of 2000 millimeters) axial flow check valve successfully passed its practical application tests. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715995 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2034 to 2026: Beijing Aerospace Power Research Institute’s first large-scale TO+RTO combustion unit designed independently began operating at full capacity successfully. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-03-22
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-03-23
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-03-24
【HaiChuan Equipment Guessing Game】==What a big ice cream! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716191 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #92026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial facility for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process was put into commission at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
Reply #102026-03-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #112026-03-25
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: 15 years in total! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.