HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pilot blockage in hydrogen fluoride production

2017-03-29View Original

Thread Content

How to connect the accident absorption system to the converter
Reply #22017-06-21
An absorption tube can be connected from the tailings discharge nozzle
Reply #32017-07-18
An emergency discharge outlet is provided at the furnace tail, connected to the accident absorption tower via pipes
Reply #42018-11-20
Both the front and rear ends can be connected to an accident absorption tower

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.