The operating pressure of the low-pressure gas pipeline is 2–3 KPA. Arc welding was used during on-site construction, and inspections after completion revealed defects such as incomplete welding, lack of fusion, and pores within the welds. The overall appearance quality was good, and the pipeline passed the on-site airtightness and strength pressure tests. Can this be put into use? Will there be any major problems during operation? . . . .
Reply #22016-07-14
It shouldn’t be possible; gas is flammable and explosive, and an accident can occur if it leaks. The inspection results must be 100% satisfactory.
Reply #32016-07-14
You need to check the acceptance specifications; some of them allow it.
Reply #42016-07-14
You need to check the acceptance specifications to see what tests are required and what quality level is considered acceptable. . .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.