HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How is it determined or calculated how much the anchor bolts of the pump foundation or equipment foundation should protrude above the top of the foundation? Which mark.

2016-12-14View Original

Thread Content

How is it determined or calculated how much the anchor bolts of the pump foundation or equipment foundation should protrude above the top of the foundation? Which standards are available? ? Thank you
Reply #22016-12-14
This is determined based on the installation elevation of the equipment and the height of the supports, as well as the size of the nuts – whether it’s double nuts or single nuts
Reply #32016-12-21
Is there a more intuitive calculation legend? ?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.