Currently, the materials used in the workshop tend to crystallize, and therefore the storage tanks, pumps, and material pipelines are mostly equipped with partial or full jackets. Steam (at low and medium pressures) is used for heat tracing. Due to the compact layout of the equipment, along with the large number of devices and pipelines, using individual drain systems would result in too many such devices that there wouldn’t be enough space for them. On the other hand, using centralized drainage systems may lead to poor drainage performance (unless the correct type of drain valve is selected). I would appreciate it if experts in the HaiChuan industry could advise me on how to make a multi-point hydrophobic layout in workshops simple, aesthetically pleasing, and practical. Additionally, on the first floor of the workshop, the drainage systems generally follow a path that goes downward first and then upward (the drain valves cannot be placed too high, as this makes it difficult for workers to operate them; moreover, the main condensate pipes are located on the pipe rack). This layout is really unsightly. How can the drainage layout on the first floor of the workshop be made simpler, more aesthetically pleasing, and more practical?
In this case, it is recommended to combine more steam traps, as the heating requirements are not high. It is necessary to equip it with a condensate collection tank and a water pump to control the liquid level and enable automatic start/stop.
I don’t know what medium this is. I have seen jacketed heating systems used with media such as phthalic anhydride and asphalt, and no issues with inadequate heating have occurred. The layout involves one pipeline for the medium and one heating line for each; drain valves are placed near the boundary of the equipment, from where they lead back to the main condensate pipe. Q:563509475 can be explored in depth
How about placing the steam trap assemblies for the heat-tracing pipes in the workshop outside the workshop? ?
How about placing the steam trap assemblies for the heat-tracing pipes in the workshop outside the workshop? ?
All I’ve seen are set up this way: when there’s no space in the workshop, they’re placed as far below the utility corridors in the common areas as possible; If the pipeline does not extend to public areas, it should be installed at the starting or ending point of the pipeline, grouped together beneath the pipe racks in the workshop, to facilitate inspection and maintenance.
This also facilitates drainage; otherwise, the interior would remain damp due to the water drain valve
Draw a sketch by hand for the original poster’s reference
All the branch pipes lead to the main pipe, which can be placed in a convenient location
I was wondering if there are any materials or drawings available on this topic. I would appreciate it if you could share them with me. Thank you!
I work in the field of fine chemicals, dealing with heat-traced pipelines. These pipelines are not straight; there are many bends, and they are long in length and numerous in quantity, with a compact layout.