【Haichuan Expands Horizons】Modular Installation of Steel Structure for Pipeline Tunnels in Guangxi Petrochemical Project

2024-05-07View Original

Thread Content

On April 30, 2024, at the site of the Guangxi Petrochemical Integration and Transformation Project, which was constructed under the general contract of Dalian Branch of China Kunlun Engineering Co., Ltd., the first module of the key chemical processing and thermal pipeline systems was successfully installed in one go, following the steady lowering of a 750-ton crawler crane. This marks the first successful implementation of a closed-loop process for design, procurement, and construction for the Guangxi Petrochemical project at the Dalian branch. It is also the first successful example of modular construction using steel structures for pipe corridors by CNPC, representing a breakthrough by the company in the field of construction using the new model of \"factory-prepared components + modular construction\".
Reply #22024-05-07
The total number of modules for the petrochemical processing and thermal pipeline networks in Guangxi is 181, and the first module to be lifted this time is one of the module in pipeline gallery No. 4. This module features a 4-axis, two-frame structure, measuring 27 meters in length, 6 meters in width, 9 meters in height, and weighing 58 tons. “The construction mode of \"factory prefabrication + modular construction\" shifts the production process from traditional on-site work to factory-based manufacturing, by fabricating and installing the steel structures for utility tunnels as well as the process pipelines. This approach enables simultaneous operations at \"one installation site plus four factories (module manufacturing plant, steel structure manufacturing plant, pipeline anti-corrosion plant, concrete structure manufacturing plant)\", **improving construction efficiency, ensuring unobstructed roads during construction, reducing risks associated with work at heights, and thus contributing to enhanced construction safety, improved quality, better practices in construction, and an improved working environment.\"
Reply #32024-05-07
Thank you for sharing the information; the forum is even better with you here!
Reply #42024-05-11
This is a large project, a major undertaking – that’s great
Reply #52024-05-11
On April 14, news came from Guangxi Petrochemical indicating that with the last load of earthwork removed from the flare area on the chemical plant site, the leveling work involving over 9.6 million square meters of land at the site of Guangxi Petrochemical’s integrated refining and chemical processing transformation project was completed with high quality. This has created the conditions and laid the foundation for the comprehensive advancement of civil engineering works such as the preparation of the site for construction, the installation of utility lines, and the construction of utility tunnels. As integrated project construction progresses in various locations, site grading has become a key factor affecting the overall advancement of these projects. Guangxi Petrochemical Company actively carries out project coordination and planning, assisting with various tasks such as the approval process for forest and farmland within the project site, the relocation of industrial enterprises, and the demolition of remaining residential buildings. The Engineering Management Department faces challenges head-on, pools collective wisdom and efforts to solve problems, remove bottlenecks, and overcome obstacles. It meets daily with construction units and other parties to discuss progress on daily work plans as well as the amount of machinery and equipment being utilized, thereby creating a working environment in which both the local authorities and enterprises work together to advance the project. China National Petroleum Corporation’s Guangxi Petrochemical integration and transformation project is an important measure to optimize the layout of petrochemical operations in the southwest region. With a total investment of 3,045,914 million yuan, it is scheduled to be completed and put into operation by 2025. Once the project is completed and put into operation, it will play a significant role in filling the gap in the region’s high-end chemical and new material industry, meeting the market demands of areas along the Western Land-Sea New Corridor, and helping to develop a trillion-dollar green chemical and new material industry cluster in the western region aimed at serving ASEAN.
Reply #62024-05-13
The photos only show the modular installation of the ductwork; there are no pipes.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.