English — Forum #721 (Page 55/106)
- [Haichuan Hydrogen Energy] Jingzhou’s 8,000 Nm3/h electrolytic water hydrogen production and storage project approved - HCBBS Forum
- [Ten years of development of chemical equipment] A new record for the installation weight of dynamic positioning floats on domestic offshore oil and gas platforms from 926 to 2023. - HCBBS Forum
- The 1.2 million tons per year coal powder pyrolysis demonstration plant of Shaanxi Coal Yulin Chemical has been operating continuously and stably for over 240 hours - HCBBS Forum
- 【Ten Years of Great Progress in Chemical Technology】088-2023: China’s first 10-ton hydrogen liquefaction unit was put into operation in Linzi - HCBBS Forum
- 【Haichuan Equipment Guessing Game】That lace trim around it is very aesthetically pleasing - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Technology】World’s largest production facility for high-performance membranes put into operation from 2010 to 2023 - HCBBS Forum
- Sinopec takes over a super-large coal chemical project worth 23.8 billion yuan; its development is underway - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】Domestic Class 4500 ultra-high pressure globe valves for harsh operating conditions, 2012–2023 - HCBBS Forum
- [Ten years of development of chemical equipment] 1027-2022 Complete sets of ultra-high molecular weight polyethylene (UHMWPE for short) equipment - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Engineering Equipment】The first use of the international minimum-angle mountain crossing technique for oil and gas pipelines in China from 1974 to 2022 - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Engineering Equipment】959–2009: China’s First 300,000-ton FPSO Completely Designed and Built Independently - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Equipment】The first large-tow carbon fiber production line in China was successfully commissioned between 2017 and 2022 - HCBBS Forum
- Gansu Zhihui Green New Energy Co., Ltd. is building a demonstration project for the integration of modern coal chemical industry and new energy sources - HCBBS Forum
- [Ten years of major development in chemical equipment] 847-2016 Localization of air-cooled reactors for methanol plants in Nanjing Guochang Chemical Technology - HCBBS Forum
- 【Haichuan Chemical Project Updates】16.7 billion! Guang’an Bemida signs a contract with China Chengda for a 500,000-ton/year bisphosphonate project - HCBBS Forum
- [Haichuan Hydrogen Energy] Sinopec has supplied over 900 tons of hydrogen to the Guangdong-Hong Kong-Macao Greater Bay Area - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Engineering Equipment】From 1986 to 2008, a professor from Zhejiang University developed the world’s largest hydrogen storage tank with a capacity of 5 cubic meters - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Equipment】The first commercial use of domestically produced 90MPa compressors took place between 2008 and 2023! - HCBBS Forum
- [Ten years of development of chemical equipment] 879-2023 Acceptance of Safety Monitoring System for Hazardous Chemicals Floating Roof Storage Tanks - HCBBS Forum
- On May 18, domestic polysilicon prices dropped significantly - HCBBS Forum
- 【Ten Years of Great Progress in Chemical Technology】The world’s first aromatic-type mobile-bed light naphtha aromatization unit was successfully commissioned between 2009 and 2020 - HCBBS Forum
- Progress on the construction of Sinopec Zhijin’s 500,000 tons/year PGA (polyglycolic acid) production facility - HCBBS Forum
- The world’s first RTC process heavy oil catalytic cracking unit has been fully commissioned! - HCBBS Forum
- [Ocean Chemical Engineering News] Guangxi Petrochemical Refining and Chemical Integrated Transformation and Upgrading Project with a total investment of 30.5 billion has started - HCBBS Forum
- [Ten years of development of chemical equipment] From 979 to 2023, my country’s longest deepwater oil and gas pipeline was laid - HCBBS Forum
- Electro-adsorption zero-discharge full-process new technology debuts at the Environmental Expo to solve the problems of water resources and zero-discharge of wastewater - HCBBS Forum
- 【Ten Years of Great Development in Chemical Processing Equipment】The 2,403-meter dual-track pipeline project for the Yichang section, part of the Jiujiang Yangtze River crossing project, from 1972 to 2015 - HCBBS Forum
- [Ten years of major development in chemical technology] 171-2023 The world's first melamine plant with the largest single-line production capacity begins trial production - HCBBS Forum
- Hualu Company – Announcement on the 901 Breather Valve Project for Yankuang Xinjiang Coal Chemical Co., Ltd.’s 60,000-ton per year melamine production project - HCBBS Forum
- 【Information on Haichuan Chemical Project】Pre-submission public notice for the environmental impact assessment of methanol-to-olefins and downstream processing in Guangxi Huayi Energy Chemicals - HCBBS Forum
- Pujieneng Chemical cooperates to develop new α-olefin products - HCBBS Forum
- The design meeting for the High-End Chemical Technology Incubation Base (Phase 1) of the Yulin Guozhong Coal Chemical Industry Demonstration Base was held - HCBBS Forum
- Xinjiang kicks off construction of 60,000-ton polyoxymethylene project - HCBBS Forum
- [Ocean Chemical Project Information] Ordos Zhuozheng 55 billion degradable and high-performance new material integrated demonstration project has been registered - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Equipment】The first 34-ton piston-type skid-mounted high-speed large-scale compressor unit was approved after operational testing from 2016 to 2023 - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】799-2020: 360,000 tons/year high-efficiency four-in-one nitric acid production units for a wide range of operating conditions - HCBBS Forum
- 【Haichuan’s Insights】Using Clean Fuels to Replace Part of Conventional Energy in CFB Boilers by Combusting Biomass Fuels Directly - HCBBS Forum
- On June 1, the benchmark price for polysilicon was 14. 330,000 yuan per ton, a decrease of -22.52% compared to the beginning of last month. - HCBBS Forum
- [Multiple Nozzles] Shandong Yulong Island coal gasification hydrogen production project completes important milestones - HCBBS Forum
- Xinjiang Kingho Energy’s annual 5.5 billion cubic meter coal-to-natural gas project feasibility study review has made substantial progress - HCBBS Forum
- The pilot plant for producing methanol via CO₂ hydrogenation has passed the evaluation - HCBBS Forum
- Tangshan Zhonghao Chemical will build a new facility for producing 60,000 tons of polyoxymethylene and 40,000 tons of nylon 66 - HCBBS Forum
- [Work Safety Exposure Platform] It is unreasonable to install foam generators on the top of fixed-roof storage tanks - HCBBS Forum
- [Ten years of major development in chemical technology] 028-2019 The world’s first dual fluidized bed ultra-large pulverized coal gasification technology industrial test device ( - HCBBS Forum
- The lifting of the first batch of large-scale equipment for the gasification-based hydrogen production project in Shandong Yulong Petrochemical’s Yulong Island integrated refining and chemical complex was successfully completed - HCBBS Forum
- Hualu’s “Key Technologies for Large-Scale, High-Efficiency Low-Temperature Desulfurization and Decarbonization of Syngas” has passed the appraisal - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】International standards for corrosion-resistant alloy composite elbows and fittings issued from 2018 to 2023 - HCBBS Forum
- [Haichuan Hydrogen Energy] Jiangmen has built a factory for diaphragm compressors with an annual production capacity of up to 500 units per year - HCBBS Forum
- New opportunities for green hydrogen driven by lower costs of green electricity - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Equipment】New valves for coal direct liquefaction plants were approved for use between 1994 and 2023 - HCBBS Forum
- 【Haichuan Chemical Engineering Updates】Yulong Petrochemical installs the first section of the regenerator for its 4 million tons per year catalytic cracking unit - HCBBS Forum
- 【Haichuan Project Updates】Baotailong Daqing Oilfield plans to build a 400,000-ton acetic acid project by Heilongjiang Longmei Tiantai - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2015 to 2023, SHENGU’s first gas onshore terminal combustion-driven centrifugal compressor unit was successfully tested - HCBBS Forum
- 【Ten Years of Great Progress in Chemical Technology】The PO/SM plant at Zhejiang Petrochemical achieved successful commissioning on the first attempt, using domestic process packages from 2009 to 2023 - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】High-pressure hydrogen storage tanks with pressures of 50 MPa and 98 MPa were successfully produced from 1989 to 2023 - HCBBS Forum
- [Ten years of development of chemical equipment] Shipment of the largest module of 100 billion cubic meters of gas field in Bohai Bay from 1076 to 2023 - HCBBS Forum
- Progress on the construction of the Zhengda Kai project for producing 1.2 million tons of ethylene glycol along with 100,000 tons of electronic-grade dimethyl carbonate as a new material - HCBBS Forum
- Construction begins on the thermal power section of the Xinjiang Xinji Energy and Chemical Project - HCBBS Forum
- The air separation unit of Shuanghuan Company’s ammonia synthesis upgrade project has successfully produced qualified oxygen and nitrogen products - HCBBS Forum
- [Haichuan Hydrogen Energy] The emerging clean hydrogen market is set to create a global market worth $1.4 trillion by 2050 - HCBBS Forum
- Huayang New Materials’ 60,000-ton PBAT project achieved successful trial production - HCBBS Forum
- Sinopec’s project for producing 123 tons of green hydrogen per year through alkaline water electrolysis using megawatt-class green electricity has been put into operation - HCBBS Forum
- Yan’an Energy Chemical Olefin Polymerization Center of Yanchang Petroleum: Successful technical upgrade of the recycle gas compressor - HCBBS Forum
- [Work Safety Exposure Platform] Inspection team looks for “time bombs” around schools: Gas company has failed to make necessary corrections after a year - HCBBS Forum
- Jinhua Machinery signed an order with Inner Mongolia Dongli Photovoltaic Electronics Co., Ltd. for 3 cold hydrogenation reactors worth 69 million yuan each - HCBBS Forum
- Future Energy: Writing a New Chapter in the Efficient and Clean Use of Coal - HCBBS Forum
- With a total investment of 8 billion yuan, the caprolactam project (Phase II) of Yongrong Technology has successfully produced high-quality products - HCBBS Forum
- [Ocean Hydrogen Energy] China is expected to become the world’s largest importer of clean hydrogen - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】The 730-2019 Zhanjiang offshore refined oil pipeline on the Chinese mainland, with a length of up to 4,071 meters - HCBBS Forum
- Is the design of the tower internals carried out by a design institute, or by a specialized manufacturer? - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】China’s First LNG Ship Refueling System with Fully Independent Intellectual Property Rights, 1997–2023 - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Equipment】Yizheng Chemical Fiber’s 700-ton Oxidative Pressure Distillation Column from 1987 to 2023 - HCBBS Forum
- Progress of Tianchen’s General Contracting for the Gasification-based Hydrogen Production Project - HCBBS Forum
- The upper section of the ethanol purification tower for Anhui Carbonxin Technology Co., Ltd.’s methanol comprehensive utilization project has been delivered and lifted into place - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】2018–2023: The first use of domestic force control software systems within China’s petrochemical industry - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】1046–2023: Large-scale axial flow compressor units for amino acid biofermentation projects - HCBBS Forum
- [Haichuan Hydrogen Energy] 6 achievements of Hebei Iron and Steel included in the \"International Advanced Hydrogen Energy Technologies Catalog\" - HCBBS Forum
- Tongwei officially commenced construction of its first 200,000-ton high-purity silicon project in Yunnan - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Engineering Equipment】Directional Drilling for the 890.14-meter Natural Gas Pipeline in the Wujiang River Area, Fuling, from 2007 to 2015 - HCBBS Forum
- Application for technical reform approval of the project on classified and quality-based utilization of low-rank coal in Xinjiang - HCBBS Forum
- 【Ten Years of Great Progress in Chemical Technology】 series of summary posts – continuously being updated! - HCBBS Forum
- 【HaiChuan Chemical Project Updates】Shenhua’s coal-to-oil project is moving forward into the field of new materials - HCBBS Forum
- [Haichuan Hydrogen Energy] The world’s first offshore hydrogen production project has begun producing its first batch of green hydrogen - HCBBS Forum
- Goldwind Science & Technology has signed a project for wind power-based hydrogen and methanol production with Zhalaitai Banner in Xingan League, Inner Mongolia, with a capacity of 2 million kilowatts - HCBBS Forum
- The lifting of the first batch of large-scale equipment for the gasification-based hydrogen production project in Shandong Yulong Petrochemical’s Yulong Island integrated refining and chemical complex was successfully completed - HCBBS Forum
- [Special rectification in action] Flammable goods are stacked in idle areas of some "factories within factories" - HCBBS Forum
- Jinan Refining and Chemical Distributed Photovoltaic Power Generation Project Successfully Connected to the Grid to Generate Power - HCBBS Forum
- 【Haichuan Chemical Accident Updates】An explosion and fire occurred in a raw material storage warehouse where welding work was being carried out in Nanyang, Henan - HCBBS Forum
- The main hydrogen supply pipeline for the Xinjiang Kuche green hydrogen demonstration project has been installed - HCBBS Forum
- Installation of the Jinhua Furnace 3.0 gasification unit for the coal classification, quality differentiation, clean and efficient comprehensive utilization project of Shaanxi Longhua Coal Industry Technology - HCBBS Forum
- Analysis of the 5 Key Companies in Polysilicon Industry - HCBBS Forum
- 【Ten Years of Great Progress in Chemical Technology】031-2022: China’s first industrial-scale domestically produced liquid hydrogen plant was successfully commissioned - HCBBS Forum
- Unleashing True Value through Targeted Efforts – A Record of Lu’an Chemical Tianji Group’s Nitric Acid Plant’s Success in Reducing Consumption and Increasing Production - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Equipment】Record-breaking from 1995 to 2023! ! Single unit on West-East Gas Pipeline Line 4 welds 75 joints per day - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】The largest flow rate marine platform fire pump systems in China from 1977 to 2022 - HCBBS Forum
- [Ten years of development in chemical technology] 046-2019 The world’s first CO2 synthesis DMF kiloton pilot project was successful in Zaozhuang - HCBBS Forum
- Breakthrough achieved in natural gas hydrogen production technology by the Chinese Academy of Sciences - HCBBS Forum
- 【Haichuan Teahouse】The design institute is very busy - HCBBS Forum
- 【Haichuan Confined Space Incident】001-2018: 3 persons entered a confined space in violation of regulations by ignoring the oxygen deficiency alarm, resulting in asphyxiation due to argon accumulation - HCBBS Forum
- The construction of the Xinjiang Coal Chemicals plant, owned by Shandong Energy Group Xinjiang Energy Chemicals Company, which is capable of producing 60,000 tons of melamine per year, has been accelerated” - HCBBS Forum