HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

First Public Information Disclosure on the Environmental Impact Assessment for Hualu Hengsheng’s DMF Technology Upgrade Project

2020-02-26View Original

Thread Content

First Public Information Disclosure on the Environmental Impact Assessment for Hualu Hengsheng’s DMF Technology Upgrade Project. Author/Source: Shandong Hualu Hengsheng Chemical Co., Ltd. Date: February 26, 2020. Views: 27. I. Basic Information on the Construction Project Project Name: Hualu Hengsheng Chemical Co., Ltd.’s DMF Technology Upgrade Project. Construction location: No. 24, Tianqu West Road, Decheng District, Dezhou City, Shandong Province. Project Overview: The proposed DMF technology upgrade project aims to replace the existing 1# DMF unit in Plant A. It involves constructing units such as a methamine plant, a tank farm, a DMF unit, and a CO membrane separation unit in Plant A. The planned production capacity is 100,000 tons per year for the DMF unit, 100,000 tons per year for the methamine unit, and 20,000 Nm3/h for the CO membrane separation unit, with an annual operating time of 8,000 hours. The project makes use of existing utility facilities such as accident water transfer ponds, accident water tanks, and sewage treatment plants, and upgrades the fire water tanks; it also constructs new facilities including a compressor building, unit tank areas, a circulating water station, a control room, and a substation. With a total investment of 380.07 million yuan, and in accordance with the \"Guidelines for Industrial Structure Adjustment (2019 edition)\\", this project falls under the category of projects that are permitted; its construction is in line with **industrial policies** ;
Reply #22020-05-19
Hello, expert. I saw your post regarding the public consultation notice for the environmental impact assessment of Hualu Hengsheng’s 100,000-ton DMF capacity expansion project. I was wondering if you could locate the environmental impact assessment report for this project. I’m reaching out urgently; I’ll be sure to thank you accordingly{:1_90:}
Reply #32020-05-19
Hello, expert. I saw your post regarding the public consultation notice for the environmental impact assessment of Hualu Hengsheng’s 100,000-ton DMF capacity expansion project. I was wondering if you could locate the environmental impact assessment report for this project. I’m reaching out urgently; I’ll be sure to thank you accordingly{:1_90:}
Reply #42020-05-26
It was designed by Hualu Hengsheng’s own design institute. Is your company interested in methylamine DMF?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.