First Public Information Disclosure on the Environmental Impact Assessment for Hualu Hengsheng’s DMF Technology Upgrade Project. Author/Source: Shandong Hualu Hengsheng Chemical Co., Ltd. Date: February 26, 2020. Views: 27. I. Basic Information on the Construction Project Project Name: Hualu Hengsheng Chemical Co., Ltd.’s DMF Technology Upgrade Project. Construction location: No. 24, Tianqu West Road, Decheng District, Dezhou City, Shandong Province. Project Overview: The proposed DMF technology upgrade project aims to replace the existing 1# DMF unit in Plant A. It involves constructing units such as a methamine plant, a tank farm, a DMF unit, and a CO membrane separation unit in Plant A. The planned production capacity is 100,000 tons per year for the DMF unit, 100,000 tons per year for the methamine unit, and 20,000 Nm3/h for the CO membrane separation unit, with an annual operating time of 8,000 hours. The project makes use of existing utility facilities such as accident water transfer ponds, accident water tanks, and sewage treatment plants, and upgrades the fire water tanks; it also constructs new facilities including a compressor building, unit tank areas, a circulating water station, a control room, and a substation. With a total investment of 380.07 million yuan, and in accordance with the \"Guidelines for Industrial Structure Adjustment (2019 edition)\\", this project falls under the category of projects that are permitted; its construction is in line with **industrial policies** ;
Hello, expert. I saw your post regarding the public consultation notice for the environmental impact assessment of Hualu Hengsheng’s 100,000-ton DMF capacity expansion project. I was wondering if you could locate the environmental impact assessment report for this project. I’m reaching out urgently; I’ll be sure to thank you accordingly{:1_90:}
Hello, expert. I saw your post regarding the public consultation notice for the environmental impact assessment of Hualu Hengsheng’s 100,000-ton DMF capacity expansion project. I was wondering if you could locate the environmental impact assessment report for this project. I’m reaching out urgently; I’ll be sure to thank you accordingly{:1_90:}