Zhanghua Machinery has manufactured 151 core pieces of equipment, including gasifiers, for the Xinjiang coal-to-natural gas project carried out by Special Transformer Corporation

2025-10-10View Original

Thread Content

Zhanghua Machinery has been responsible for manufacturing the gasifiers for TBEA’s coal-to-natural gas project in Xinjiang. It was recently reported that, according to Suzhou Tianwo Technology, the company was invited to Changji, Xinjiang, to attend the inauguration ceremony for this coal-to-natural gas project with an annual production capacity of 2 billion cubic meters, which took place on September 20, 2025, organized by TBEA. Zhanghua Ji has taken on the task of manufacturing 151 key pieces of equipment for the coal-to-natural gas project carried out by TBEA, including gasifiers, reactors, towers, and heat exchangers used in the gasification, shift, and methanation processes. Xinjiang Tianchi Energy Co., Ltd. is a large-scale energy enterprise established by TBEA as part of its strategy to utilize the region’s abundant resources. It holds the exploration rights for four coal mines: the South Open-Pit Coal Mine and the North Open-Pit Coal Mine in the Zhundong Daqing mining area in Xinjiang, as well as the No. 1 and No. 2 Open-Pit Coal Mines in the Xizhong Xiheshan mining area. The total proven coal reserves of these mines amount to 12.6 billion tons. On the evening of March 31, TBEA (600089) announced that in order to make full use of the company’s own coal resources, to achieve clean and efficient utilization of these resources, and to increase their added value, its wholly-owned subsidiary Tianchi Energy will invest in the construction of the Zhundong coal-to-natural gas project with an annual capacity of 2 billion Nm3, through its wholly-owned subsidiary Zhuneng Chemical. In August 2025, the environmental impact assessment document for this project was approved by the Ministry of Ecology and Environment. The project uses coal as raw material and employs fixed-bed slag gasification; syngas is produced through conversion and low-temperature methanol washing for purification. This syngas is then used in methanation to produce 2 billion cubic meters per year of synthetic natural gas (with an actual production volume of 2.04 billion cubic meters per year), while crude phenol and crude benzene are produced as by-products. Hydrogen is produced by electrolyzing water, and it serves as the hydrogen source for the methanation unit; the oxygen generated by water electrolysis is sent to wastewater treatment. The projects include fixed-bed slag gasification, shift cooling, low-temperature methanol washing, methane synthesis, drying and compression of synthetic natural gas, natural gas liquefaction, gas-water separation, phenol and ammonia recovery, hydrogen production via water electrolysis, carbon capture, and air separation. The project undertakes the following demonstration tasks: 1. Industrial demonstration of fixed-bed slag gasification suitable for high-alkali metal coal in the Junggar region. A large-scale fixed-bed slag gasifier with a gasification pressure of 4.5 MPa and an inner diameter of 3.8 meters is planned to be used. The methane content in the effective gas from fixed-bed slag gasification can reach around 8%, which helps to reduce the processing load in subsequent processes. 2 A large-scale industrial demonstration project for autonomous methanization technology is planned to be carried out to demonstrate this technology on an industrial scale. By combining wide-temperature conversion and methanation reactors in series and parallel, the capacity of the methanation unit has been increased from the maximum 1.375 billion cubic meters per year for a single unit in use to 2 billion cubic meters per year. The wide-temperature conversion process is employed to effectively reduce the reactor inlet temperature and make full use of low-grade thermal energy ; Energy savings and increased production in the methanation unit are achieved by reasonably distributing the fresh gas entering reactors at different levels. 3. The coal-based natural gas coupled with green electricity hydrogen production demonstration project includes the construction of wind power and other renewable energy projects, to ensure that no less than 51% of the electricity used by the remaining facilities comes from green sources (in other words, 51% of the electricity supplied to these facilities, aside from that generated by the on-site ORC system, comes from green electricity). 4 Demonstration project for high-concentration carbon dioxide capture and storage: Construction of a carbon capture facility with an annual capacity of 900,000 tons. Among them, a carbon capture facility with an annual capacity of 700,000 tons will be built on-site, and another facility with an annual capacity of 200,000 tons will be constructed as part of the associated projects. 5 Fixed-bed slag gasification technology for the treatment and resource utilization of phenol-ammonia wastewater: The biochemical treatment of phenol-ammonia wastewater employs an intermittent high-multiplication biological treatment process (IMC process), which achieves high resistance to shock loads and high nitrogen removal efficiency.
Reply #22025-10-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2723-2025: Dongfang Boiler pioneers boiler-unit integration technology to unlock new possibilities for lignite utilization https://bbs.hcbbs.com/thread-5702453-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-10-10
【Haichuan’s National Day Spending Spree】The long holiday is coming to an end – what local specialties are packed in the trunk? https://bbs.hcbbs.com/thread-5702601-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-10-10
【Haichuan’s Grand Spending for National Day】Good news. There are only 132 days left until the next major holiday, the Spring Festival. https://bbs.hcbbs.com/thread-5702665-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-10-10
【Haichuan’s Grand Spending on National Day】On the first day back to work after the long holiday, full of energy! https://bbs.hcbbs.com/thread-5702678-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-10-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】2025–2075: From Black Shackles to Green Building Materials – The Transformation of Coal-Based Solid Waste https://bbs.hcbbs.com/thread-5702535-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-10-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2724-2025 Fuzhou City base, the first national **-level research, testing, and demonstration facility for offshore wind power, is expected to come into operation this year. https://bbs.hcbbs.com/thread-5702507-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-10-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】From Reliance on Imports to Global Leadership: 6 Years of Efforts to Develop Helium, the “Blood of Industry”, 2726–2025 https://bbs.hcbbs.com/thread-5702633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-10-12
【Ten Years of Rapid Development in Chemical Equipment】2727–2025: High pressure to reach 10 MPa! Zhongneng Dàyǒu has successfully developed a multi-field coupling testing device for hydrogen production using 100kW-class PEM electrolyzers. https://bbs.hcbbs.com/thread-5702702-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-10-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, CNPC Pipeline Bureau successfully developed an intelligent anti-corrosion construction robot for storage tank exteriors. https://bbs.hcbbs.com/thread-5702707-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-10-13
【Ten Years of Rapid Development in Chemical Equipment】The first AI optimization model for methanol distillation units in China was put into operation at Yulin Energy Chemical Complex in Shaanxi from 2029 to 2025. https://bbs.hcbbs.com/thread-5702720-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.