English — Forum #721 (Page 62/106)

Prev 59 60 61 62 63 64 65 Next
  1. By the end of 2022, Meijin Energy expects to have 30 hydrogen refueling stations in operation, with a total of over 1,600 hydrogen fuel trucks in use - HCBBS Forum
  2. 【Ten Years of Rapid Development in Chemical Equipment】The first low-cost 10,000-ton per year polysilicon production facility in China was put into operation from 2014 to 2018 - HCBBS Forum
  3. 【Ten Years of Rapid Development in Chemical Equipment】All 4 17-megawatt compressors at the Shenyang Liaoluo Compression Station, built between 2008 and 2022, are of domestic manufacture - HCBBS Forum
  4. [Ocean Chemical Project Information] Sinopec advances the 800,000-ton coal-to-olefins project in Dalu - HCBBS Forum
  5. 【Major Equipment in the Chemical Equipment Industry】164-14m diameter, total weight of 1187 tons – the largest vacuum distillation column in China in terms of processing capacity per unit - HCBBS Forum
  6. 【Major Industrial Equipment in the Chemical Industry】334 – Zhongke Hengfa supercritical CO2; the boiler technology has successfully passed the evaluation by the **Safety and Energy Efficiency Technology Committee** - HCBBS Forum
  7. 【HaiChuan Chemical Project Updates】BASF to build a pentaerythritol plant at its integrated facility in Zhanjiang - HCBBS Forum
  8. 【Major Chemical Equipment in China】531—Steel pipes for Project West Gas East Transmission Line 4, produced in Ziyang, Shashi, Baoji, and Nanjing from 2022 - HCBBS Forum
  9. 【Haichuan Teahouse】Do you know the four famous mothers in Chinese history? - HCBBS Forum
  10. 【Ten Years of Great Development in Chemical Processing Equipment】Hydrotreating Reactors for 3.6 million tons/year Diesel Hydrocracking Units from 1963 to 2022 - HCBBS Forum
  11. 【Haichuan Chemical Accident Update】Leak and fire at spherical tank pump at the petrochemical division in Maoming, Guangdong; 2 people missing, 1 person injured - HCBBS Forum
  12. 【Sea and River Safety Incident Updates】Fire breaks out in a solvent processing workshop at a pharmaceutical factory in Shaoxing - HCBBS Forum
  13. 【Major Equipment in the Chemical Equipment Industry】Domestic production of 341-900,000 tons/year propane dehydrogenation 36\" Class150 high-temperature three-way quick-change control valves - HCBBS Forum
  14. 【Major Industrial Equipment in the Chemical Industry】368 — CASIC-11 exports 109 water hammer relief valves to Saudi Aramco - HCBBS Forum
  15. 【Major Industrial Equipment in the Chemical Industry】345 – The World’s Largest Offshore Wind Power Converter Station - HCBBS Forum
  16. 【Major Equipment in the Chemical Engineering Sector】363—First batch of N08810 corrosion-resistant alloy forgings produced using self-made steel ingots - HCBBS Forum
  17. 【Major Industrial Equipment in the Chemical Engineering Sector】428 – Super-large LNG-powered ship fuel tank pump towers from 2021 - HCBBS Forum
  18. [Haichuan Chemical Accident Information] A gas cabinet caught fire in a Panzhihua gas company - HCBBS Forum
  19. [Chemical Equipment Powerful Equipment] 537-2022 Wuheng Chemical BDO High Pressure Hydrogenation Reactor - HCBBS Forum
  20. 【Major Chemical Equipment Components】Steel supplied by HBIS for low-temperature fittings of the Sino-Russian X80 gas pipeline from 2018 to 385 - HCBBS Forum
  21. 【HaiChuan Chemical Project Updates】A new energy materials project involving ferric phosphate and lithium iron phosphate is to be built in Yidu, Hubei, with a total investment of 18.684 billion yuan - HCBBS Forum
  22. [Ocean Science and Technology Frontier] Chinese scientists have achieved the hydrogenation of carbon dioxide to prepare long-chain olefins under normal pressure - HCBBS Forum
  23. The first unit of Sinopec’s third-generation domestic aromatic hydrocarbon technology – the 890,000-ton/year aromatic hydrocarbon complex at Jiujiang Petrochemical – was successfully commissioned for the first time - HCBBS Forum
  24. [Haichuan Teahouse] It is recommended to move the public infrastructure section to the craftsmanship area - HCBBS Forum
  25. 【Major Equipment in the Chemical Engineering Sector】501 — The upper module of the Jieyang Shenquan II offshore pressure station, weighing 3,365 tons, from 2022 - HCBBS Forum
  26. 【Ten Years of Rapid Development in Chemical Processing Equipment】Successful First Use of the World’s Largest Concentration Filter from 2009 to 2022 - HCBBS Forum
  27. Developments related to electrolyzers in the first half of 2022: electrolyzer projects have also entered a period of rapid growth - HCBBS Forum
  28. [Chemical Equipment Powerful Country and Important Equipment] 425-2018 7 Argentina Campana Refinery diesel hydrogenation (DHT) 41 skid device projects - HCBBS Forum
  29. 【Updates on Haichuan Chemical Project】The installation of the first large-scale equipment for the urea production unit at the Shandong Jinmei Mingshui Chemical Project – the urea synthesis tower – was successfully completed - HCBBS Forum
  30. 【Major Industrial Equipment in the Chemical Industry】154 – China’s world’s largest crude oil distillation tower - HCBBS Forum
  31. 【Major Industrial Equipment in the Chemical Industry】The first successful use of DN1000 diameter ductile iron pull pipes from 399 to 2020 - HCBBS Forum
  32. 【HaiChuan Chemical Project Updates】Dazhou, Sichuan plans to build a project for producing 1.2 million tons of ethylene glycol along with 100,000 tons of electronic-grade DMC - HCBBS Forum
  33. 【Ten Years of Rapid Development in Chemical Equipment】The Ili Xintian Coal Chemical Plant, the largest coal-to-gas project in terms of scale from 2007 to 2022, recorded a record annual natural gas production volume - HCBBS Forum
  34. 9 sets of diesel hydrogenation units are in industrial application, and the activity and stability of the hydrogenation catalyst of Sinopec Dalian Institute has reached the international leading level - HCBBS Forum
  35. [Haichuan New Energy] The first batch of integrated wind and solar hydrogen production projects in Inner Mongolia, with a total capacity of 2.72 million kilowatts, has commenced construction - HCBBS Forum
  36. 【Major Equipment in the Chemical Engineering Sector】392-2009: China’s First 36,000-ton Vertical Extruder for Ferrous Metal Pipes - HCBBS Forum
  37. 【Major Industrial Equipment in the Chemical Industry】488—2022: The World’s Largest Photovoltaic Power Generation Park by Installed Capacity - HCBBS Forum
  38. 【Major Industrial Equipment in the Chemical Industry】193 – Domestic high-end, ultra-long and ultra-thick SA302GrC container plates for petrochemical use - HCBBS Forum
  39. 【Major Equipment in the Chemical Engineering Sector】315 – The first set of multi-nozzle opposed semi-waste-boiler water-coal slurry gasification industrial demonstration unit completed on-site testing - HCBBS Forum
  40. 【Major Equipment in the Chemical Engineering Sector】From 1937 to 2007, Ansteel supplied coiled plates for China’s first major pipeline project using X80 grade steel - HCBBS Forum
  41. 【HaiChuan Chemical Project Updates】Upgrading Project for the ABS Plant at Shanghai Gaoqiao Petrochemical - HCBBS Forum
  42. 【Ten Years of Rapid Development in Chemical Engineering Equipment】700 kilometers of steel pipes for the Niger-Benin crude oil pipeline project, manufactured by Baoji Steel Pipe from 2016 to 2022 - HCBBS Forum
  43. 【Haichuan Expands Horizons】20 Cranes Work in Unison to Lift a 500-Meter-Long Pipeline - HCBBS Forum
  44. Hydrogen compressors account for 30% of the cost of hydrogen refueling stations - HCBBS Forum
  45. 【Major Industrial Equipment in the Chemical Industry】558 – HDPE Suspension Stirring and Reaction Vessels Made in Jiangsu from 2019 - HCBBS Forum
  46. 【Major Industrial Equipment in the Chemical Industry】446 – The first standardized, design-built unmanned platform was installed at sea - HCBBS Forum
  47. 【Haichuan Project Updates】The hydrogen production capacity from coke oven gas in Lüliang, Shanxi, will reach 40,000 tons by the end of this year - HCBBS Forum
  48. 【Ten Years of Rapid Development in Chemical Processing Equipment】Independent sealing testing for LNG containment systems from 2016 to 2022 – filling a crucial gap in the entire industry chain - HCBBS Forum
  49. A 16.6-megawatt “twin-turbine” offshore wind turbine will be introduced in China - HCBBS Forum
  50. 【Major Equipment in the Chemical Equipment Industry】On-site welding of 10 towers for the 1.86–60,000 tons/year polysilicon project - HCBBS Forum
  51. Lithium extraction from gas field water for the first time in the country - HCBBS Forum
  52. 【Major Chemical Equipment】Fluidized Bed Reactors for Large-Scale Polysilicon Projects from 393 to 2018 - HCBBS Forum
  53. [Chemical Equipment Powerful Country and Important Equipment] 441-2022 Taiyuan Iron & Steel Co., Ltd. successfully supplied N08120 materials for key equipment of the polycrystalline silicon project - HCBBS Forum
  54. 【Major Chemical Equipment Innovations】372—China’s first set of \"250 Nm3/h small skid-mounted natural gas hydrogen production equipment\" has passed evaluation - HCBBS Forum
  55. 【Ten Years of Rapid Development in Chemical Processing Equipment】620–2022: CAS Refining and Chemicals Introduced Explosion-Proof Inspection Robots - HCBBS Forum
  56. 【Ten Years of Rapid Development in Chemical Engineering Equipment】Steam generation trial operation of China’s largest molten salt energy storage project under construction from 2016 to 2022 - HCBBS Forum
  57. 【Information on Haichuan Chemical Project】The 300,000 tons per year BDO and related fine chemicals project at Chiping Xinfa Huaxing uses the Guanda process package - HCBBS Forum
  58. What is the relationship between polysilicon and emission reduction? ? ? ? - HCBBS Forum
  59. 【Haichuan Teahouse】Brain-teasing Series: The Inscribed Circle of a Right Triangle - HCBBS Forum
  60. 【Major Industrial Equipment in the Chemical Industry】313 – Construction begins on China’s first inland hydrogen fuel cell-powered workboat, the “Three Gorges Hydrogen Boat 1” - HCBBS Forum
  61. 【Major Industrial Equipment in the Chemical Industry】201 – Ten years ago, a gas-phase reactor for refining was assembled at a dock in Quanzhou, Fujian - HCBBS Forum
  62. 【Ten Years of Rapid Development in Chemical Engineering Equipment】646-2022 Domestic-made Seawater Titanium Plate Plate Heat Exchangers - HCBBS Forum
  63. The desalination and crystallization unit at Guoneng Yulin Chemical produces sodium chloride - HCBBS Forum
  64. 【Major Equipment in the Chemical Equipment Industry】291 – Domestic production of high-parameter full-system spiral plate heat exchangers - HCBBS Forum
  65. 【Special Inspection by the Ministry of Emergency Management】In November, dozens of potential problems were identified in Guangzhou and Zhanjiang cities, including 6 major risks - HCBBS Forum
  66. 【Major Equipment in the Chemical Equipment Industry】Shipping of skid units for hydrogen production conversion units manufactured by Air Liquide Argentina from 2017 to 2019 - HCBBS Forum
  67. Today, the total trading volume of national carbon emission allowances (CEA) was 100,010 tons, with a total transaction value of 5,500,590.00 yuan. - HCBBS Forum
  68. 【Ten Years of Rapid Development in Chemical Processing Equipment】648-2021: China’s First Large-Scale PTA Core Component – Titanium Alloy Stirring Shaft - HCBBS Forum
  69. 【Major Industrial Equipment in the Chemical Engineering Sector】526—2022: Six-axle hydrogen fuel cell hybrid locomotive for the Ningdong Railway - HCBBS Forum
  70. The fact that energy consumption for raw materials is not included in the overall energy consumption limits – is this good news for the coal chemical industry? - HCBBS Forum
  71. 【Haichuan Teahouse】Have you noticed? Where are accidents caused by drinking alcohol likely to occur? - HCBBS Forum
  72. Have you encountered any of the 8 major scams in the engineering field? - HCBBS Forum
  73. 【Major Equipment in the Chemical Equipment Industry】293 – China’s first large-scale plate-and-shell heat exchanger for a 650,000-ton/year phenol propylene plant - HCBBS Forum
  74. 【Ten Years of Rapid Development in Chemical Processing Equipment】On-site assembly of Hongyi Chemical’s 84.7-meter CO2 scrubber from 2015 to 2022 - HCBBS Forum
  75. 【Major Equipment in the Chemical Engineering Sector】237 – China’s first set of hydrogen storage cylinder assemblies for 45MPa hydrogen refueling stations - HCBBS Forum
  76. 【Major Industrial Equipment in the Chemical Industry】241 – CCTV News reports on the overall modular construction of Yancheng’s largest storage tank with a capacity of 270,000 cubic meters - HCBBS Forum
  77. 【Major Equipment in the Chemical Equipment Industry】The 2,000-ton SE-Dongfang furnace was manufactured and delivered for the first time from 2019 to 498 - HCBBS Forum
  78. 【Major Chemical Equipment from a Leading Country】184-Mao-type gas-phase reactor exported to Oman - HCBBS Forum
  79. How are the boundaries of a project defined? For example, how are ISBL and OSBL determined? - HCBBS Forum
  80. 【Major Industrial Equipment in the Chemical Industry】302 – Multiple petrochemical technologies and equipment have been included in the **Energy Administration’s List of First-of-Their-Kind Major Technical Equipment** - HCBBS Forum
  81. 【Major Equipment in the Chemical Engineering Sector】LNG Ship Inconel Welding (Part 1) - HCBBS Forum
  82. [Haichuan Workplace Evening Chat] What does it mean when a gentleman is disrespectful? - HCBBS Forum
  83. [Special Inspection of the Ministry of Emergency Response 2022] 17-Anhui provincial-level random inspections of 18 chemical companies found nearly 170 hidden dangers! - HCBBS Forum
  84. [Chemical Equipment Powerful Equipment] 324--Double-cylinder double-acting hydraulic diaphragm pump for coal gasification and coal slurry transportation - HCBBS Forum
  85. 【Major Chemical Equipment】339 – Double-seal special nickel-based alloy dedicated stop valve - HCBBS Forum
  86. 【Major Industrial Equipment in the Chemical Industry】The first stainless-steel chemical carrier of 410-13,800 DWT, the “Jinhaiying”, was delivered - HCBBS Forum
  87. 【Haichuan Teahouse】Special report: The sweeping old man made a mistake; everyone, come and take a look! ! ! ! - HCBBS Forum
  88. 【Major Equipment in the Chemical Engineering Sector】The acetylene screw compressors were successfully replaced with domestically produced versions from 2015 to 2022 - HCBBS Forum
  89. 【Major Chemical Equipment】413 – The 900,000 tons/year gas separation unit at Zhejiang Petrochemical, along with towers A and B for the propylene separation, built between 2018 - HCBBS Forum
  90. 【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2003 to 2022, Nantong CIMC Pacific Offshore successfully developed and manufactured domestic high-manganese steel LNG storage tanks - HCBBS Forum
  91. Where can I find the documents I published? - HCBBS Forum
  92. 【Ten Years of Rapid Development in Chemical Processing Equipment】639-2022: China’s largest and most intelligent cylindrical FPSO ever built - HCBBS Forum
  93. 【Major Chemical Equipment Projects】245 – Construction of 35 modules for a Canadian LNG project with a total weight of around 179,000 tons - HCBBS Forum
  94. 【Ministry of Emergency Management’s Special Inspection in 2022】13 – Some company executives in Sichuan were negligent; safety facilities were incomplete” - HCBBS Forum
  95. 【Major Industrial Equipment in the Chemical Industry】Domestic production of special ultra-high temperature valves capable of withstanding 1500℃ from 2015 to 335 - HCBBS Forum
  96. 【Haichuan Project Updates】The first 1,000-ton equipment for Tianjin Nangang’s million-ton ethylene plant has been successfully installed - HCBBS Forum
  97. 5 chemical plant fires in half a year! The State Council carries out special rectification and inspections of major safety hazards - HCBBS Forum
  98. 【Haichuan Teahouse】No wonder Su Shi was so erudite - HCBBS Forum
  99. With an additional investment of $759 billion, petrochemical products can have almost no carbon emissions. - HCBBS Forum
  100. 【Major Equipment in the Chemical Equipment Industry】183 – Sinochem Refining’s first domestically produced dry gas seal has been operating stably for over 500 days - HCBBS Forum
Prev 59 60 61 62 63 64 65 Next