Thread Content
Announcement on the Electrical and Instrumentation Project for the Air Separation Unit in the Phase III Methanol Project of Ningxia Baofeng, undertaken by Sinochem Sixth Construction Company – Northwest Branch. Author/Source: Date: 2021-12-02. Clicks: 10. *1. Procurement Conditions: The construction project related to the methanol component of the 500,000 tons/year coal-based olefins project carried out by Sinochem Sixth Construction Company and Ningxia Baofeng Energy Group Co., Ltd. has sufficient funding available; the electrical and instrumentation work for the air separation unit is now ready for bidding (Bidding Number: 66GXCGFA211125011). The tenderer is China National Chemical Engineering Corporation Sixth Construction Co., Ltd., and public competitive negotiations are now being conducted. 2. Procurement Content and Scope 2.1 Procurement content and scope of this project: (1) Bid (package) number: 66GXCGFA211125011/01; (2) Name of bid (package): China National Chemical Engineering Corporation Sixth Construction Co., Ltd. – Northwest Branch – Ningxia Baofeng Methanol Phase III Project – Electrical and instrumentation works for the air separation unit; (3) Procurement content and scope: Carry out the construction of the electrical and instrumentation works for the air separation unit, which is part of the methanol project associated with Ningxia Baofeng Energy Group Co., Ltd.’s 500,000 tons per year coal-to-olefins project, in accordance with the requirements of the client. 2.2 Planned duration: 330 days. 2.3 Location of construction: Area A of the Baofeng Energy Group project in Ningdong Town, Lingwu City. 2.4 Requirements regarding construction quality and safety: Quality requirements: The quality of the work must meet the specified standards as well as the relevant industry acceptance criteria. Safety requirements: The construction team must have a full-time safety manager who must hold the required certification to perform their duties ; All construction works were carried out without any accidents ; Employees are covered by accident insurance ; Comply with all the management regulations set by the property owner and the project team ; No wage-related disputes occur ; Comply with the law. 2.5 Others: None. 3. Qualification requirements for bidders 3.1 Qualification requirements for bidders 1. Potential bidders must be on the shortlist of qualified subcontractors of China Chemical Engineering Sixth Construction Co., Ltd. 2. Meet the relevant qualification requirements of China Chemical Engineering Sixth Construction Co., Ltd. 3.2 Bidders shall not fall under any of the following circumstances: (1) Being the same person as the person in charge of another bidder for this project. (2) There is a direct controlling relationship with other bidders for this project. (3) Having a management relationship with other bidders for this project. (4) There have been the following serious adverse circumstances in business operations over the past three years: ① Being suspended, disqualified from bidding, or prohibited from participating in procurement activities by the industry regulatory authorities at or above the provincial level where this project is located, in accordance with the law. ②It is in a state where it has been ordered to suspend operations, have its license temporarily seized or revoked, its permits temporarily seized or revoked, or its qualification certificates revoked. ③Entering liquidation proceedings, being declared bankrupt, or encountering other circumstances that result in an inability to fulfill obligations. ④According to the company’s management requirements, those who are prohibited from participating in procurement activities and whose restrictions are still in effect. 3.3 Whether the project accepts consortia: Yes/No. The parties involved in a consortium shall, in accordance with their division of responsibilities as stipulated in the agreement, meet the corresponding conditions and requirements set out in paragraph 3.1 of this article ; None of the parties to the consortium shall be in the situation specified in paragraph 3.2 of this article ; None of the parties in the consortium shall submit response documents on their own behalf, nor shall they participate in the procurement process for this project as part of another consortium. Otherwise, all relevant response files will be invalid. 4. *Access period: From 10:00 on December 6, 2021, to 10:00 on December 9, 2021 (Beijing Time). This tender project is accessible only to regular members. Your current permissions do not allow you to view the detailed information. Please click “Register/Login” or contact our staff to apply for membership. Only after becoming a regular member can you access the detailed tender announcements, application forms, project attachments, and certain tender documents.