HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The large-scale coal-based new materials industrial park in Dangyang, Hubei, with a total investment of 11.5 billion yuan, is set to be launched soon

2025-07-04View Original

Thread Content

! A large-scale coal-based new materials industrial park in Dangyang, Hubei, with a total investment of 11.5 billion yuan, is set to commence operations. Update date: 2025-07-03. Recently, the \"Dangyang Lvyuan Chemical Co., Ltd. Coal-Based New Materials Industrial Park Project\" was registered on Hubei Province’s online approval and supervision platform for investment projects, marking the imminent start of this project. The project is located in the Baling Chemical Industrial Park within Dangyang High-Tech Zone. It is planned to cover an area of 1,473.6 mu, with a total investment of 11.5 billion yuan. The facilities to be built include production units capable of producing 400,000 tons of ammonia per year (utilizing advanced pressurized continuous coal-water slurry gasification technology), 300,000 tons of functional urea, 80,000 tons of wet-process electronic chemicals, 80,000 tons of methylamine, 60,000 tons of melamine, 20,000 tons of dimethyl carbonate, and 12,000 tons of dimethyl sulfoxide. Additionally, new production workshops, raw material warehouses, product warehouses, as well as public utility and auxiliary facilities, and environmental protection systems will also be constructed. Upon completion, the project will accelerate the transformation of Dangyang’s traditional chemical industry toward greater sophistication, higher quality, and greener practices. It will facilitate the development of a new materials industry, help extend the industrial chain further, and attract more upstream and downstream enterprises to form industrial clusters, thereby injecting new momentum into the high-quality development of the regional economy.
Reply #22025-07-05
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest rotating packed-bed carbon capture technology, 2501-2025, has successfully passed factory tests. https://bbs.hcbbs.com/thread-5696246-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-07-05
【HaiChuan’s Insights】Commissioning of high-temperature dechlorination facilities in the refining and reforming unit to address process corrosion issues such as salt formation in hydrogenation feed heat exchangers caused by high chlorine content in naphtha https://bbs.hcbbs.com/thread-5696253-1-1.html (Source: HaiChuan Chemical Forum)
Reply #42025-07-05
【HaiChuan’s Insights from Other Sources】Mao Ming Petrochemical’s Intelligent Operation Center system has been put into use, significantly improving the company’s operational efficiency. https://bbs.hcbbs.com/thread-5696254-1-1.html (Source: HaiChuan Chemical Forum)
Reply #52025-07-06
【Ten Years of Great Development in Chemical Equipment】 From 2503 to 2025, the 4.0 MPa semi-waste heat boiler gasifier used in aerospace engineering operated stably for 660 days. https://bbs.hcbbs.com/thread-5696262-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #62025-07-06
【Ten Years of Rapid Development in Chemical Processing Equipment】2504–2025: Evolution of fluidized-bed hydrogen peroxide technology in China’s petrochemical industry, breaking through foreign technological restrictions https://bbs.hcbbs.com/thread-5696263-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-07-07
HaiChuan’s TikTok account has been launched; you can go take a look when you have time: https://bbs.hcbbs.com/thread-5696092-1-1.html (Source: HaiChuan Chemical Forum)
Reply #82025-07-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2009 to 2025, the Keshen Gas Field, China’s first ultra-deep onshore gas field located in the Tarim Oil Field, has produced a total of over 90 billion cubic meters of natural gas. https://bbs.hcbbs.com/thread-5696419-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-07-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2009 to 2025, the Keshen Gas Field, China’s first ultra-deep onshore gas field located in the Tarim Oil Field, has produced a total of over 90 billion cubic meters of natural gas. https://bbs.hcbbs.com/thread-5696419-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-07-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】Over the past 10+ years, efforts have been made to develop silicon-aluminum-based artificial zeolite molecular sieves to turn low-concentration gas into valuable resources. https://bbs.hcbbs.com/thread-5696512-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-07-10
【Ten Years of Great Development in Chemical Equipment】 From 2023 to 2025, CIMC Pacific Offshore successfully delivered the world’s first 3,000-cubic-meter ammonia fuel tank. https://bbs.hcbbs.com/thread-5696606-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.