HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Construction begins on the demonstration project in Guazhou, Gansu, for the clean and efficient utilization of 10 million tons per year of low-grade coal through classification and quality differentiation, in combination with new energy sources

2023-10-05View Original

Thread Content

Recently, the groundbreaking ceremony for Gansu Zhihui Green New Energy Co., Ltd.’s demonstration project on the clean and efficient utilization of 10 million tons per year of low-grade coal through classification and quality separation, in combination with new energy sources, was held. Project nature: New project. Project location: Liugou Coal Chemical Industry Park, Guazhou County, Jiuquan City, Gansu Province. Project investment: 240,000 million yuan. Project details: This project is constructed in two phases. The first phase involves the development of a circular economy industrial chain for coal, electricity, oil, and gas; it includes the construction of a 6 million tons per year raw coal pyrolysis unit, a 4 million tons per year coal pyrolysis combined unit, 2×100 MW waste gas power generation units, a 600,000 tons per year coal tar hydrogenation combined unit, a 50,000 tons per year crude phenol refining unit, a 60,000 tons per year PBS production unit, a 150,000 tons per year special coking unit for lithium battery anode materials, as well as environmental protection facilities and auxiliary production facilities such as substations, cabinet rooms, sewage treatment systems, chemical water treatment plants, air and nitrogen supply stations, and plant flares ; The second part involves the integration of hydrogen energy with other energy sources, as well as the development of a complementary industrial chain; it includes the construction of 2×500MW wind farms and 2×500MW solar power plants, along with the necessary utility systems and supporting facilities.
Reply #22023-10-05
【Ten Years of Rapid Development in Chemical Processing Equipment】Successful Domestication and Operation of Seals for Large-Diameter Imported Slurry Pumps from 2011 to 2021 https://bbs.hcbbs.com/thread-5262288-1-1.html (Source: Haichuan Chemical Industry Forum Website)
Reply #32023-10-09
Construction has begun on the second phase of Guangzhou Petrochemical’s hydrogen energy project, with a new production capacity of 5,200 cubic meters per hour. https://bbs.hcbbs.com/thread-5268347-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.