English — Forum #721 (Page 6/106)

Prev 3 4 5 6 7 8 9 Next
  1. [Haichuan Overseas Engineering] Practical Training on Wall-Climbing Anti-Corrosion Robots for the Lobito Refining Project in Angola - HCBBS Forum
  2. Approval granted for the modification of the 200,000-ton green methanol integrated project in Guyang County, which combines new energy green electricity for hydrogen production with biomass utilization - HCBBS Forum
  3. All unit installations for the Rongsheng New Materials project have commenced construction in full - HCBBS Forum
  4. The pressure testing of the process pipelines in the pipeline gallery of the gasification unit for the Guoneng Baotou Chemical Coal-to-Olefins Upgrade Demonstration Project was completed successfully - HCBBS Forum
  5. [Haichuan Overseas Engineering] The heat treatment of the first 8,800 m³ spherical tank for the Phase I project of the Lobito refinery in Angola was completed successfully - HCBBS Forum
  6. The 40,000-ton per year lithium hexafluorophosphate production project invested in and built by Hubei Hongyuan Fluorine Chemical Co., Ltd - HCBBS Forum
  7. Invest 150 million yuan! The Ulan Tai’an Energy and Chemical Industry Air Separation Optimization Project has received approval for its environmental impact assessment - HCBBS Forum
  8. The first trial run of the turbine in the pyrolysis gas compression unit of Fujian Gulei’s 1.5 million tons per year ethylene plant was successful - HCBBS Forum
  9. Jiangsu Supor invests 4.77 billion yuan to build two high-end chemical projects - HCBBS Forum
  10. [Haichuan Overseas Engineering] CNOOC Engineering Qingdao Company successfully completed the testing of the largest helium-nitrogen pressure vessel in Qatar’s modular project - HCBBS Forum
  11. [Haichuan Overseas Engineering] All five large compressors for the PUSRI-IIIB project in Palembang, Indonesia, have been successfully lifted into place! - HCBBS Forum
  12. [Haichuan Overseas Engineering] The Amur Gas Chemical Complex (AGCC) plant will produce its first batches of polyethylene and polypropylene products in the summer of 2026 - HCBBS Forum
  13. Sinochem Consortium secures EPC general contract for 50,000 tons/year cyclohexane dehydrogenation project in Inner Mongolia - HCBBS Forum
  14. The second section of the three-spinner in the reactor has been installed, and the last large-scale equipment for the MTO unit at the Inner Mongolia Rongxin project has been successfully lifted into place! - HCBBS Forum
  15. Public announcement on the environmental impact assessment for CNOOC Huizhou C3 and C4 olefins pilot project - HCBBS Forum
  16. The No. 2 propylene distillation column of the olefin separation unit in the Shenhua Baotou coal-to-olefins upgrade demonstration project has been successfully hoisted into place - HCBBS Forum
  17. The upper head of the reactor in the 800,000-ton olefin production facility of the Inner Mongolia Rongxin Olefins project has been hoisted into place; the main structure installation is now complete, and work has begun on the process piping for polypropylene production - HCBBS Forum
  18. Total investment of 500 million yuan! Public announcement on Zhejiang Hongfu’s project to mix and fill 127,100 tons of environmentally friendly refrigerants and cleaning agents per year - HCBBS Forum
  19. Lanshi Heavy Equipment successfully completed the manufacturing of 4 syngas separation and washing towers for the Ningxia Baofeng coal-to-olefins project - HCBBS Forum
  20. Hebei Zhongjian Resource Recycling Co., Ltd.’s project for the comprehensive utilization of 3 million tons per year of high-organic-content saline wastewater and 50,000 tons per year of waste salt - HCBBS Forum
  21. The 90% scale model review for the power station of Lanze Dafeng Port’s project to produce 300,000 tons of green methanol per year has been successfully completed - HCBBS Forum
  22. Public notice on the acceptance of the environmental impact assessment for Juhua Co., Ltd.’s 55 kt/a dichloropropanol project - HCBBS Forum
  23. The two projects related to the construction of the Guangdong Jieyang 5.2 million cubic meter crude oil commercial reserve depot – namely the upper structure installation and oil and gas recovery – have both been completed - HCBBS Forum
  24. [Haichuan Overseas Engineering] Large chimney for Saudi Mining Company’s Ras Al Khair Phosphate Fertilizer project installed in one go through lift installation - HCBBS Forum
  25. Invest 1.65 billion yuan! Xinjiang Zhongkun New Materials’ 2x600,000-ton natural gas-to-ethylene glycol project has been approved - HCBBS Forum
  26. The Nantong Blue Sea New Materials Power Station has entered a critical phase of final push to complete its development - HCBBS Forum
  27. The pilot project on Zhejiang Kemao Environmental Technology’s PTP (propylene production from waste plastics) technology is set to be put into operation soon - HCBBS Forum
  28. Commissioning of air separation unit for phosphorus-coal chemical integration project in Bijie, Guizhou - HCBBS Forum
  29. Changchun-Shijiazhuang Natural Gas Pipeline Project (Zhangjiakou-Shijiazhuang section), Package 2: 219.87 km - HCBBS Forum
  30. The topping-out of the 35KV substation for the Guoneng Zhundong coal-to-gasification plant was successfully completed - HCBBS Forum
  31. Public announcement on the acceptance of the environmental impact assessment report for Inner Mongolia’s 90,000 tons/year tar hydrogenation benzene extraction project - HCBBS Forum
  32. Hunan announces 156 major industrial projects, with new energy and new materials playing a key role - HCBBS Forum
  33. Gansu Pei Xin New Materials Co., Ltd.’s project for producing 250,000 tons per year of coal-based new materials - HCBBS Forum
  34. The design meeting for the Inner Mongolia Baofeng renewable energy-based green ammonia and alcohol demonstration project was held successfully - HCBBS Forum
  35. First public announcement on the environmental impact assessment for Zhongke Fuyuan’s project to produce 100,000 tons of immersion cooling fluid per year - HCBBS Forum
  36. 179.8 million yuan! Lanshi Heavy Equipment has been pre-selected to supply the core gasification unit for a domestic coal-to-oil project - HCBBS Forum
  37. The first piece of equipment for Hunan Petrochemical’s pilot plant has been installed in place - HCBBS Forum
  38. With a total investment of 5 billion yuan, the project is planned to produce 3 million tons of urea per year; the Pingmei Shenma Zhanjiang Green and Low-Carbon Urea Demonstration Project has been launched - HCBBS Forum
  39. The hydrogen-electric coupling project at Jinchuan Chemical has recently completed the necessary compliance procedures as well as the ‘three connections and one leveling’ tasks, and has now entered the construction phase - HCBBS Forum
  40. The 800,000-ton/year coal-to-olefins upgrade demonstration project of Sinopec Great Wall Energy Chemical Co., Ltd. has commenced construction in the Dalu Industrial Park of the Zhungeer Economic Development Zone - HCBBS Forum
  41. Construction begins on Jiangsu Aoke Chemical’s project to expand production capacity of 190,000 tons per year of high-end fine chemical materials - HCBBS Forum
  42. Announcement on the Winner of the Full-Process Consulting Contract for the 30,000 tons per year hydrogen production project of Junrui Green Hydrogen Energy (Shangdu County) Co., Ltd. in Shangdu County - HCBBS Forum
  43. Wuhai West, Inner Mongolia? Come? The air cooling island of the peak coke dry quenching project has been fully covered - HCBBS Forum
  44. The steel structure installation work for the Beihai methanol project was completed successfully - HCBBS Forum
  45. Completion Acceptance of the Technical Renovation Project for Haisufu Perfluoropolyether Production Line - HCBBS Forum
  46. Mudanjiang 400,000 tons/year biodegradable modified materials and products made from such materials project - HCBBS Forum
  47. [2026 Industry Updates] Overview of the latest progress in China’s SAF projects in 2026 — Carbon Creates Everything - HCBBS Forum
  48. Upgrading project for Hebei Zhengyuan Hydrogen Energy Technology Co., Ltd.’s production capacity to 600 million Nm3 of hydrogen per year - HCBBS Forum
  49. Bid for EPC general contracting of the 400MW wind-powered hydrogen production new energy demonstration project in Baiyang City - HCBBS Forum
  50. All 16 large spherical tanks of the Rongsheng New Materials Zhoushan project, with a total investment of 76 billion yuan, have been successfully completed - HCBBS Forum
  51. Air Liquide invests 350 million yuan to expand its bulk gas station in Lingang, Shanghai, to support the SMIC East project; environmental impact assessment now available for public review - HCBBS Forum
  52. Handover of the dry gas separation unit with an annual capacity of 500,000 tons for the raw material adaptability improvement project at Fujian Fuhai Chuang Petrochemical Co., Ltd - HCBBS Forum
  53. 470 million yuan! Second public announcement for Shandong’s 90,000-ton/year anhydrous aluminum fluoride and high-end fluorine-containing materials co-production project! - HCBBS Forum
  54. Lanshi Heavy Equipment provides 20 key pieces of equipment to drive the upgrading of the lubricant industry at Liaohe Petrochemical - HCBBS Forum
  55. Public Tender for the General Contracting of PC Works for Research and Demonstration of Key Technologies for Off-grid Hydrogen Production via Photovoltaic-Energy Storage-Hybrid System (Hydrogen Production in an Integrated Engineering Framework) by Guohua Investment Guohua (Ningxia) New Energy Co., Ltd - HCBBS Forum
  56. The main structure of the 20,000-cubic-meter large-scale stainless-steel cryogenic storage tank for the new LNG storage tank project at China Coal Hubei Energy Chemical Synthesis Center has been completed - HCBBS Forum
  57. The 50,000-ton/year caprolactam-to-adipamide production facility at Xuyang Group’s Yuncheng plant has been fully commissioned - HCBBS Forum
  58. Common chemical reactions in chemical production processes and safety technical requirements - HCBBS Forum
  59. The Jin Kou jointing construction work was completed at the Qitaihe branch pigging station of Section 1 of the Hulin-Changchun gas pipeline project - HCBBS Forum
  60. Model review of 60% for the upgrading project of refinery wastewater pretreatment in Unit 1 of Lanzhou Petrochemical’s utility engineering department - HCBBS Forum
  61. Total investment of 23.1 million yuan! Foshan Nanhai Hongtai Gas’ secondary expansion project for industrial gas filling has been approved for consideration - HCBBS Forum
  62. Anhui Xingxin plans to build a project for the production of resorcinol and catalysts - HCBBS Forum
  63. Junrui Green Hydrogen Energy (Shangdu County) 30,000 tons/year hydrogen production project - HCBBS Forum
  64. The energy-saving report for the project of Sanying Haishifu Chemical Co., Ltd., which aims to produce 30,000 tons per year of high-end fluorine-based fine chemicals, has been approved after review - HCBBS Forum
  65. Overview of Yichang Bampu Recycling Technology Co., Ltd.’s 300,000-ton project for the recycling of used lithium iron phosphate batteries - HCBBS Forum
  66. The main structure of the second-phase development project for Bohai’s first giant gas field with a capacity of 100 billion cubic meters has been completed - HCBBS Forum
  67. The project for producing green hydrogen from pear tree resources, combined with biomass for the production of green methanol, has officially commenced - HCBBS Forum
  68. First Public Announcement on Public Participation in the Environmental Impact Assessment of POE Project of Sinochem Western New Materials Co., Ltd - HCBBS Forum
  69. Results of the EPC general contract bidding for the Wuxi Weifu High-Tech Hydrogen Energy Industrial Park project announced - HCBBS Forum
  70. Lifting of adipic acid equipment for high-end new materials at Zhejiang Petrochemical; CCCC to carry out work in the second half of the year - HCBBS Forum
  71. Bid Invitation for the Design of a Biochar Production Unit in the Pear Tree Landscape-Based Green Hydrogen and Biomass-Coupled Green Methanol Project - HCBBS Forum
  72. The air separation construction project for the Phase I of the phosphorus-coal chemical integration project in Bijie, Guizhou, officially commenced in Zhijin County, Bijie City - HCBBS Forum
  73. The first phase of Hubei HuiNeng Chemical’s green and low-carbon integrated project involving coal, phosphorus, potassium, fluorine, wind power for hydrogen production, and the production of high-value ecological nitrogen compounds, with a total investment of nearly 6.932 billion yuan, has completed its registration procedures - HCBBS Forum
  74. Public notice on the environmental impact assessment approval for technical renovation projects related to products such as Haisifu trifluoroacetamide in Sanming City - HCBBS Forum
  75. 【2026 Industry Updates】Overview of the latest progress in China’s SAF projects in 2026 — Qingdao Shangyu Environmental Protection - HCBBS Forum
  76. Hebei Zhonghao New Materials plans to build a new polyether polyol production facility - HCBBS Forum
  77. The 10,000 m³ jet fuel tank project at the Tahe Refining and Chemical Complex in Xinjiang, constructed by Sinopec Fourth Construction Company, was completed successfully - HCBBS Forum
  78. The Rongxin Chemical Project in Inner Mongolia has reached an important milestone in its construction – the pressure testing of the process pipelines has officially begun, marking the official entry of the project’s construction phase into the pipeline testing stage - HCBBS Forum
  79. Yulin City Magnesia Slag Resource Utilization and Carbon Sequestration Demonstration Project - HCBBS Forum
  80. Environmental impact assessment for the green technological upgrade project of ethofenprox technical material at Chizhou Feihao Da accepted - HCBBS Forum
  81. 2026 Domestic Water Reducer Industry Data Monitoring and Research Report - HCBBS Forum
  82. The key project of the Jiji Lake Industrial Park in the Zhundong Economic Development Zone in Xinjiang – the Wojiang New Materials project, which involves the production of 730,000 tons per year of high-end coal-based new materials – is expected to start construction in the fourth quarter of 2026, with completion and operation set for 2028. - HCBBS Forum
  83. The lifting of the crude argon column and crude argon condenser for Unit 5 of Phase 1 of the second phase of Shaanxi Coal Yulin Chemical was completed successfully - HCBBS Forum
  84. The Fifth Circulating Water Station of Zhuo Zheng Coal Chemical Industry completed the target tasks for water supply ahead of schedule - HCBBS Forum
  85. Total investment of 13.3 billion yuan: An overview of the first phase of Jinxin Chemical’s green and innovative coal chemical project - HCBBS Forum
  86. The gasification phase of Ningxia Baofeng Energy’s Phase 4 project, a new material production facility for coal-based olefins with an annual capacity of 500,000 tons, has been successfully completed - HCBBS Forum
  87. Successful first commissioning of the circulating water system for the air separation unit in the Lianyungang Zhongxing Energy (Donghua) engineering project - HCBBS Forum
  88. 【2026 Industry Updates】Overview of the latest progress in China’s SAF projects in 2026 —— Blue Biology - HCBBS Forum
  89. The Dongtai Qi New Year project for the production of 160,000 tons of polyphenylene sulfide, as well as the McReynolds project for the production of 50,000 tons of high-end polyurethane materials per year, have been approved for establishment in Yangkou Port - HCBBS Forum
  90. All 19 units of the Jianjin AMOC fine chemicals and raw materials project, undertaken by Sinopec Refining & Chemical Engineering Group, were delivered to completion to high standards - HCBBS Forum
  91. Approval for the extension of the permit for the oil and chemical products terminal in Phase II of Fujian Gulei Refining and Chemical Integration Project - HCBBS Forum
  92. 【2026 Industry Insights】An Overview of American Chemical Companies in China – DuPont - HCBBS Forum
  93. [Haichuan Overseas Engineering] The main construction of the 30,000-cubic-meter crude oil storage tank project at the Niger site has been fully completed - HCBBS Forum
  94. The main structure of the substation construction project supporting the hydrogen production facility via water electrolysis in Phase 1 of Shaanxi Coal Project Phase II has been successfully completed - HCBBS Forum
  95. Phase III Oil Storage Tank Project of Zhoushan Aoshan Island Dading Oil Storage Co., Ltd - HCBBS Forum
  96. Zhonghua Donghua Anhui New Materials Co., Ltd.’s 303 million yuan carbon-based high-performance materials industry demonstration project - HCBBS Forum
  97. Inner Mongolia Datang International Hexigten Coal-to-Natural Gas Co., Ltd.’s 90,000-ton/year tar hydrogenation and benzene extraction project - HCBBS Forum
  98. Bidding for gasification of the Guoneng Ordos Coal Liquefaction Upgrade Demonstration Project - HCBBS Forum
  99. One-time overall lifting operation of three large storage tanks for Jieyang Juzhengyuan acetic acid project - HCBBS Forum
  100. The boiler hydrostatic test for Unit #9 of Wanhua Chemical’s Phase 3 thermoelectric project was successfully completed - HCBBS Forum
Prev 3 4 5 6 7 8 9 Next