English — Forum #174 (Page 7/76)

Prev 4 5 6 7 8 9 10 Next
  1. Can Class A single-fire compartments be separated by floors? - HCBBS Forum
  2. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210203 - HCBBS Forum
  3. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210124 - HCBBS Forum
  4. 【Daily Discussion】Utilities - BIM - 20210201 - HCBBS Forum
  5. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210601 - HCBBS Forum
  6. The coal-to-ethylene glycol plant of the Guangxi Huayi project is entering the final stage of completion - HCBBS Forum
  7. Can the thick white smoke from a chemical plant be eliminated? - HCBBS Forum
  8. The 108.5-meter granulation tower for the Hebei Zhengyuan project was successfully topped out - HCBBS Forum
  9. 【Ethylene Tank Farm Technology】Why is an insulation layer needed for ethylene spherical tanks? - HCBBS Forum
  10. The 580-ton synthesis tower of the joint synthesis unit in the Yingcheng Xindu Chemical Project was hoisted into place - HCBBS Forum
  11. 【Daily Discussion】Utilities - BIM - 20210216 - HCBBS Forum
  12. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210419 - HCBBS Forum
  13. 【Daily Discussion】Utilities - BIM - 20210530 - HCBBS Forum
  14. The construction site of the Huajin Americhem Fine Chemicals and Raw Materials Project in Panjin, Liaoning is working hard to ensure progress on the project - HCBBS Forum
  15. [Daily Discussion] Utility Engineering – Civil Construction – 20210206 - HCBBS Forum
  16. 【Daily Discussion】Utilities - Civil Engineering - 20210324 - HCBBS Forum
  17. 【Haichuan’s Best Practices】Using universal transport vehicles to install the compressor tube bank in high-pressure polyethylene systems - HCBBS Forum
  18. 【Daily Discussion】Utilities - Civil Engineering - 20210403 - HCBBS Forum
  19. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210320 - HCBBS Forum
  20. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210423 - HCBBS Forum
  21. Who is responsible for project delays? - HCBBS Forum
  22. 【Daily Discussion】Utilities - Civil Engineering - 20210430 - HCBBS Forum
  23. What does it mean to install electric heating for the condenser of a 5℃ water chiller unit? - HCBBS Forum
  24. The grinding frame of a key unit in Inner Mongolia Zhuozheng’s large-scale coal chemical project, the largest PGA project in the country, has seen its construction completed - HCBBS Forum
  25. Purchase of ladder platforms and railings for tower equipment - HCBBS Forum
  26. Signing of EPC general contract for 300,000 tons per year and half of wet-process phosphoric acid in anhydrous and dihydrate forms along with associated facilities - HCBBS Forum
  27. The first successful lift of the core equipment, the C13 tower, for the C13 liquid wax separation project in Jinxī Petrochemical Company’s urea dewaxing unit - HCBBS Forum
  28. 【Daily Discussion】Utilities - Civil Engineering - 20210529 - HCBBS Forum
  29. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210416 - HCBBS Forum
  30. 【Haichuan EPC】Fixed total price; if the contract volume is half of what was agreed, should the payment be reduced? - HCBBS Forum
  31. 【Daily Discussion】Utilities - BIM - 20210422 - HCBBS Forum
  32. The solvent regeneration unit for the Beifang Huajin project has been successfully mechanically completed - HCBBS Forum
  33. 7 chemical-related projects won the 2022-2-23 Lu Ban Award for Chinese construction projects - HCBBS Forum
  34. The main structure of Inner Mongolia Rongxin Chemical’s 400,000-ton polypropylene plant has been completed - HCBBS Forum
  35. 【Daily Discussion】Utilities - Civil Engineering - 20210117 - HCBBS Forum
  36. The first space gasification furnace for the Jin Kai relocation project was successfully lifted into place - HCBBS Forum
  37. 【Daily Discussion】Utilities - Civil Engineering - 20210314 - HCBBS Forum
  38. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210101 - HCBBS Forum
  39. 【Daily Discussion】Utilities - Civil Engineering - 20210303 - HCBBS Forum
  40. The first 10,000-ton dock in Nishinakajima has been put into operation - HCBBS Forum
  41. 【Daily Discussion】Utilities - BIM - 20210331 - HCBBS Forum
  42. 【Ethylene cracking】The origin of the underground stone forest? Which scenic spot? - HCBBS Forum
  43. 21CG 21CJ 21CS 21CX 21D 21J 21K 21MR 21X 21ZZ series catalog - HCBBS Forum
  44. Yunnan Petroleum’s first internal floating roof renovation project for oil tanks was successfully completed at the Changpo Oil Depot in Kunming - HCBBS Forum
  45. 20CJ95-1: Construction details for prefabricated insulated floor systems – FD dry-floor heating system - HCBBS Forum
  46. The 301 main substation of the Yulin Kaiyue Coal Chemical Project has completed power connection - HCBBS Forum
  47. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210105 - HCBBS Forum
  48. 【Daily Discussion】Utilities - Civil Engineering - 20210207 - HCBBS Forum
  49. New nitrogen production unit - HCBBS Forum
  50. 【Daily Discussion】Utilities - BIM - 20210129 - HCBBS Forum
  51. Inner Mongolia Xinseng Technology Co., Ltd.’s 35,000 tons per year production project for functional dyes and organic pigments - HCBBS Forum
  52. 【Daily Discussion】Utilities - Civil Engineering - 20210204 - HCBBS Forum
  53. Handle various construction permits on-site - HCBBS Forum
  54. The 4,000-ton crawler crane at the China Coal Yulin Coal Deep Processing Base project was used to lift the 1,642-ton 2# propylene tower - HCBBS Forum
  55. The absorption tower of the 270,000 tons per year nitric acid plant in Sinopec Nanhua’s aniline-rubber additive industry chain project has been successfully installed - HCBBS Forum
  56. 【Daily Discussion】Utilities - BIM - 20210207 - HCBBS Forum
  57. 【Ten Years of Rapid Development in Chemical Engineering Equipment】Significant progress has been made between 2015 and 2025 on the first pilot-scale megawatt-class pressurized oxygen-enriched combustion system, with multiple records set - HCBBS Forum
  58. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210127 - HCBBS Forum
  59. Isolation of the hot work area - HCBBS Forum
  60. 【Haichuan Chemical Engineering Updates】 Shaanxi Coal Yulin’s 176 billion yuan project for clean coal processing with a capacity of 15 million tons per year: Stage 1 of the dynamic compaction foundation treatment plan - HCBBS Forum
  61. Project Construction Information Collection 30 [Mining] List (no attachments) - HCBBS Forum
  62. 【Daily Discussion】Utilities - BIM - 20210210 - HCBBS Forum
  63. 【Daily Discussion】Utilities - BIM - 20210418 - HCBBS Forum
  64. 【Daily Discussion】Utilities - Civil Engineering - 20210405 - HCBBS Forum
  65. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210129 - HCBBS Forum
  66. The hoisting of oversized equipment was completed for the 1.2 million tons per year ethylene plant in Jilin Petrochemical Company’s refining and chemical transformation project - HCBBS Forum
  67. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210325 - HCBBS Forum
  68. The first large-scale equipment for Fujian Fuqing Wanjing Petrochemical’s 900,000-ton per year propylene production project via propane dehydrogenation was successfully lifted into place - HCBBS Forum
  69. Applying old projects without prior approval for construction! World’s largest vinyl alcohol ether plant ordered to shut down! - HCBBS Forum
  70. The integrated lifting of the washing tower for comprehensive resource utilization in Xinjiang Zhongtai was completed successfully - HCBBS Forum
  71. 【Daily Discussion】Utilities - Civil Engineering - 20210423 - HCBBS Forum
  72. Yidu Cloud collaborates with Tsinghua University to advance fundamental research and tackle technical challenges in medical infrastructure - HCBBS Forum
  73. The main structure of the hydrogen fluoride ether project at Tianjin Changlu New Materials Company has been successfully completed - HCBBS Forum
  74. 【Daily Discussion】Utilities - Civil Engineering - 20201015 - HCBBS Forum
  75. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210413 - HCBBS Forum
  76. Common faults of static phase shifters, and how to deal with faults in phase shifters - HCBBS Forum
  77. What to do when encountering a weak supervisor? - HCBBS Forum
  78. Is the approval of workshop buildings in the petrochemical industry related to the equipment foundations within those buildings? - HCBBS Forum
  79. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210220 - HCBBS Forum
  80. 【Ethylene Tank Farm Technology】What is the fire hazard level of ethylene? - HCBBS Forum
  81. The water filling test for 3 large-scale crude oil storage tanks with a capacity of 100,000 cubic meters in the expansion project of the off-site tank farm at Shenghong Refining & Chemical (Lianyungang) Co., Ltd. was successfully completed - HCBBS Forum
  82. The bottom of the first gasifier in the Shanxi Jinfeng renovation project has been installed - HCBBS Forum
  83. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210503 - HCBBS Forum
  84. 【Daily Discussion】Utilities - BIM - 20210502 - HCBBS Forum
  85. 【Daily Discussion】Utilities - BIM - 20210527 - HCBBS Forum
  86. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210331 - HCBBS Forum
  87. Fushun Petrochemical’s new 200,000-ton/year solution polymerization polyethylene plant has commenced operations - HCBBS Forum
  88. What welding electrode should be used for welding 304 and 316L? Can A102 be used? - HCBBS Forum
  89. Eliminate risks without any blind spots - HCBBS Forum
  90. Take a look at the “cutting-edge technology” on the device: 52 – Chromium carbide wear-resistant layer cladding - HCBBS Forum
  91. 【Haichuan Engineering Updates】Jingbian Natural Gas Storage and Peak Shaving LNG Project: 50,000 cubic meter LNG double-metal full-volume tank dome constructed using the \"erection method\" - HCBBS Forum
  92. Oxygen scavenger for steam boilers - HCBBS Forum
  93. 【Haichuan Expands Horizons】Overall lifting and removal of a floating roof with a diameter of 40 meters and a weight of 106 tons - HCBBS Forum
  94. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210116 - HCBBS Forum
  95. 【Daily Discussion】Utilities - Civil Engineering - 20210326 - HCBBS Forum
  96. 【Daily Discussion】Utilities - BIM - 20210302 - HCBBS Forum
  97. 【Daily Discussion】Utilities - Civil Engineering - 20210428 - HCBBS Forum
  98. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210515 - HCBBS Forum
  99. 【Daily Discussion】Utilities - BIM - 20210310 - HCBBS Forum
  100. The first large-scale equipment for Saudi Arabia’s Ras Al Khair phosphate fertilizer project was successfully lifted, thanks to a Chinese company’s efforts - HCBBS Forum
Prev 4 5 6 7 8 9 10 Next