English — Forum #174 (Page 10/76)

Prev 7 8 9 10 11 12 13 Next
  1. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210529 - HCBBS Forum
  2. 【Daily Discussion】Utilities - Civil Engineering - 20210322 - HCBBS Forum
  3. 【Daily Discussion】Utilities - BIM - 20210423 - HCBBS Forum
  4. 【Daily Discussion】Utilities - Civil Engineering - 20210103 - HCBBS Forum
  5. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210202 - HCBBS Forum
  6. Why should fire power supplies not be equipped with leakage protection - HCBBS Forum
  7. China’s largest PGA project, the Inner Mongolia Zhuozheng methanol acetic acid project, is advancing at an accelerated pace - HCBBS Forum
  8. 【Daily Discussion】Utilities - Civil Engineering - 20210530 - HCBBS Forum
  9. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210406 - HCBBS Forum
  10. High and low voltage motor, wound-rotor asynchronous motor, static phase-shifter, power factor compensator - HCBBS Forum
  11. The 11 production units at Huajin Amei have completed mechanical construction and started the process of \"three inspections and four determinations\"” - HCBBS Forum
  12. The Zhundong coal-to-natural gas pipeline branch project, the largest such project for transporting coal-derived natural gas in our country, completed 100 kilometers of welding work 60 days ahead of schedule - HCBBS Forum
  13. Construction of Henan Hongye Biology’s 20,000 tons/year bio-based **furan production facility begins - HCBBS Forum
  14. High costs compared to transactional electricity prices result in losses for coal-fired power plants; Guangxi issues guidelines to encourage market entities to adjust contract electricity prices - HCBBS Forum
  15. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210329 - HCBBS Forum
  16. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210209 - HCBBS Forum
  17. 【Ten Years of Rapid Development in Chemical Engineering Equipment】2016–2024: Qujing, Yunnan builds the world’s first pilot project for megawatt-scale air thermodynamic cycle energy storage (hereinafter referred to as “CASE”) - HCBBS Forum
  18. Layout of dust collectors in pneumatic conveying systems under nitrogen atmosphere - HCBBS Forum
  19. The lifting of the large-scale towers for the 50,000-ton maleic anhydride production facility in the first phase of Hebei Renqiu Bohang New Materials has been completed - HCBBS Forum
  20. Summary of Project Construction Standards [Energy Conservation Standards and Specifications] List (no attachments) - HCBBS Forum
  21. 【Daily Discussion】Utilities - BIM - 20210412 - HCBBS Forum
  22. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210122 - HCBBS Forum
  23. The main structure of Cabinet Room 1 for the MTO unit in Inner Mongolia Rongxin Methanol to Olefins project has been completed - HCBBS Forum
  24. The main structure of the auxiliary projects for high-end chemical new materials at Shaanxi Yueneng was successfully completed - HCBBS Forum
  25. Cable trays are installed in layers; how should they be separated when entering different layers of the device? - HCBBS Forum
  26. 【Daily Discussion】Utilities - Civil Engineering - 20210222 - HCBBS Forum
  27. 【Ethylene Tank Farm Technology】What are the methods for storing ethylene? - HCBBS Forum
  28. 【Progress of Haichuan Chemical Engineering】The 520-ton core equipment 5132-E-01001, namely the feed gas cooler, for the Baofeng project in Inner Mongolia has been successfully lifted into place - HCBBS Forum
  29. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210428 - HCBBS Forum
  30. 【Daily Discussion】Utilities - Civil Engineering - 20210604 - HCBBS Forum
  31. Modular installation of the polyethylene unit in the Tarim Phase II ethylene project at Dushanzi Petrochemical: 2,000-ton crawler cranes named “Ba Da Zhao” set a new record for the construction of polypropylene units in China! - HCBBS Forum
  32. 【Daily Discussion】Utilities - BIM - 20210427 - HCBBS Forum
  33. 【Haichuan Equipment Guessing Game】What kind of tooling is this? - HCBBS Forum
  34. 【Ten Years of Rapid Development in Chemical Processing Equipment】From 1350 to 2023: Modular installation over 3 months, 6 loop reactor units totaling 2,197.5 tons - HCBBS Forum
  35. Power supply successfully initiated at the substation of the world’s largest green hydrogen-coupled coal-to-olefins project with a single-facility scale - HCBBS Forum
  36. The first large-scale unit of Jilin Petrochemical’s acrylonitrile production complex has completed its commissioning - HCBBS Forum
  37. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210219 - HCBBS Forum
  38. 【Daily Discussion】Utilities - Civil Engineering - 20210114 - HCBBS Forum
  39. Lifting of the biomass fluidized bed gasifier for the Linquan gasification test facility constructed by Anhui Fuyang Kangtai Si - HCBBS Forum
  40. 【Daily Discussion】Utilities - BIM - 20210512 - HCBBS Forum
  41. 【Daily Discussion】Utilities - Civil Engineering - 20201013 - HCBBS Forum
  42. Lifting of large-scale equipment for the urea production unit in the second phase of Jingyuan Chemical Project - HCBBS Forum
  43. 【Daily Discussion】Utilities - BIM - 20210403 - HCBBS Forum
  44. Postponed two years ago, Itai Yili Energy Co., Ltd.’s 1 million tons per year coal-to-oil demonstration project has sparked a wave of intense activity. - HCBBS Forum
  45. An important milestone has been reached in the construction of the Inner Mongolia Zhuozheng Chemical Project: the first batch of equipment for the synthesis unit has arrived and was successfully lifted into place - HCBBS Forum
  46. 【Daily Discussion】Utilities - BIM - 20210408 - HCBBS Forum
  47. Supervisor - HCBBS Forum
  48. Is there a check valve at the connection point between the end of the boiler drum feedwater pump outlet pipe and the drum? - HCBBS Forum
  49. Lifting of large pre-hydrogenation reactor for 600,000 tons/year coal tar hydrogenation project in Xinjiang - HCBBS Forum
  50. [Discussion of the Day] Utility Engineering – Civil Construction – 20210302 - HCBBS Forum
  51. Comprehensive Collection of Project Construction Materials 24.1【Interior Decoration Standards Manual】List (no attachments) - HCBBS Forum
  52. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210510 - HCBBS Forum
  53. Dust control at construction sites – Formulating dust management plans - HCBBS Forum
  54. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210501 - HCBBS Forum
  55. 【Daily Discussion】Utilities - BIM - 20210101 - HCBBS Forum
  56. 【Daily Discussion】Utilities - Civil Engineering - 20210331 - HCBBS Forum
  57. 【Daily Discussion】Utilities - BIM - 20210424 - HCBBS Forum
  58. 【Daily Discussion】Utilities - BIM - 20210401 - HCBBS Forum
  59. 【Daily Discussion】Utilities - Civil Engineering - 20210318 - HCBBS Forum
  60. 【Daily Discussion】Utilities - Civil Engineering - 20210417 - HCBBS Forum
  61. The ethylene unit of the Tarim 1.2 million tons/year Phase II ethylene project has completed the pressure testing for the first set of process pipelines - HCBBS Forum
  62. 【Daily Discussion】Utilities - Civil Engineering - 20210104 - HCBBS Forum
  63. The adsorption tower for the diesel production facility, part of Jilin Petrochemical’s transformation and upgrading project aimed at producing 1 million tons of diesel per year, has been successfully installed - HCBBS Forum
  64. 178- Discussion on the technical plan for the project aimed at addressing the hazards associated with the exhaust gases from the wet flue gas desulfurization towers in the thermal power boilers used in petrochemical enterprises - HCBBS Forum
  65. [Haichuan Engineering Updates] Lifting of 2 EO reactors and the recycle gas centrifugal compression unit for Shandong Yulong Petrochemical’s EOEG project - HCBBS Forum
  66. Comprehensive Collection of Project Construction Documents 28【Construction Engineer】List (no attachments) - HCBBS Forum
  67. The carbonylation reactor for the butanediol project at the Guangxi Huayi facility was successfully lifted into place - HCBBS Forum
  68. 【Daily Discussion】Utilities - Civil Engineering - 20210313 - HCBBS Forum
  69. The Phase 3 project of Qinzhou Huayi has entered the peak period for equipment installation - HCBBS Forum
  70. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210418 - HCBBS Forum
  71. 【Daily Discussion】Utilities - Civil Engineering - 20210304 - HCBBS Forum
  72. The 300,000-ton/year high-pressure low-density polyethylene plant for the Tarim Phase II ethylene project at Dushanzi Petrochemical Company has officially commenced construction - HCBBS Forum
  73. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210212 - HCBBS Forum
  74. 【Daily Discussion】Utilities - Civil Engineering - 20210507 - HCBBS Forum
  75. The first ignition of Cracker Units 1# and 3# in the ethylene plant of Guangxi Petrochemical’s integration and transformation project was successful - HCBBS Forum
  76. China State Construction Engineering Corporation has obtained a patent for concrete surface curing materials suitable for harsh, windy, and dry environments and their preparation methods - HCBBS Forum
  77. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210213 - HCBBS Forum
  78. [Haichuan Modularization] The first section of the pipeline tunnel module for Shanghai Huayi’s syngas supply and supporting projects was successfully shipped - HCBBS Forum
  79. Using its own technology, Hualu Hengsheng’s 200,000 tons per year dicarboxylic acid project - HCBBS Forum
  80. All 8 process compressors of the Yan’an natural gas storage, peak shaving, and associated LNG project have been installed - HCBBS Forum
  81. 【Daily Discussion】Utilities - BIM - 20210428 - HCBBS Forum
  82. 【Haichuan Expands Horizons】400-ton specialized crane for the metallurgy industry - HCBBS Forum
  83. 【Daily Discussion】Utilities - BIM - 20210329 - HCBBS Forum
  84. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210222 - HCBBS Forum
  85. Four no’s and two direct visits! Ministry of Water Resources conducts unannounced inspections of rural water supply in southern Shaanxi - HCBBS Forum
  86. Commissioning of Unit 2, the 1.2 million tons/year ABS plant for Zhejiang Petrochemical’s high-performance resin project - HCBBS Forum
  87. Piling work has begun on Xinye Nenghua New Materials Company’s 60,000-ton/year polyoxymethylene project - HCBBS Forum
  88. The pilot production of the crude phenol refining project at Xinjiang Qinghua Energy Group Co., Ltd. was a success on the first attempt - HCBBS Forum
  89. Regarding sources for lower steam costs? - HCBBS Forum
  90. The DCS system (Distributed Control System) cabinet for Boiler No. 1 in the power station of the Huajin Amei Fine Chemicals and Raw Materials Project was successfully put into operation for the first time - HCBBS Forum
  91. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210303 - HCBBS Forum
  92. 【Daily Discussion】Utilities - BIM - 20210218 - HCBBS Forum
  93. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210123 - HCBBS Forum
  94. The Aksu Huajin atmospheric pressure liquid ammonia tank farm project passed the intermediate handover inspection - HCBBS Forum
  95. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210602 - HCBBS Forum
  96. The core equipment for Tianjin Bohai Petrochemical’s octanol optimization and safety improvement project – two \"heart-stopping\" carbonylation reactors – has arrived at the site - HCBBS Forum
  97. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210401 - HCBBS Forum
  98. Signing of the CO2 cooperation project between Ningbo Fude Energy and East China Energy - HCBBS Forum
  99. 【Ethylene Tank Farm Technology】What is the purpose of the design cofferdam for ethylene spherical tanks? - HCBBS Forum
  100. How to distinguish and identify saline solutions from ethylene glycol solutions? - HCBBS Forum
Prev 7 8 9 10 11 12 13 Next