English — Forum #174 (Page 14/76)

Prev 11 12 13 14 15 16 17 Next
  1. 【Daily Discussion】Utilities - BIM - 20210306 - HCBBS Forum
  2. Series on dust control at construction project sites - HCBBS Forum
  3. The three projects – Gongzhong Tiansheng New Materials, Messer Gas, and Haohua Gas – have been officially connected to the power supply. - HCBBS Forum
  4. Series catalogs such as 09BD, 09BN, 09CD, 09CJ, 09D, 09DX, 09G, 09J, 09MR, 09S, etc - HCBBS Forum
  5. The CO2 desorption tower and H2S concentration tower of the low-temperature methanol washing unit in the Xinjiang Xinhui Energy project were successfully hoisted into place - HCBBS Forum
  6. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210312 - HCBBS Forum
  7. Why is major maintenance always carried out during the scorching heat? - HCBBS Forum
  8. The 1 million tons per year acetic acid production project at Shenghong Refining & Chemical in Lianyungang has entered the stage of equipment and steel structure installation - HCBBS Forum
  9. The cumulative water diversion exceeded 40 billion cubic meters! Let’s see how big countries and heavy weapons can optimize the water supply pattern - HCBBS Forum
  10. 【Daily Discussion】Utilities - BIM - 20210209 - HCBBS Forum
  11. 【Ethylene Tank Farm Technology】What are the types of low-temperature ethylene storage tanks? - HCBBS Forum
  12. High dissolved oxygen in the deaerator - HCBBS Forum
  13. 【Daily Discussion】Utilities - Civil Engineering - 20210603 - HCBBS Forum
  14. 【Daily Discussion】Utilities - Civil Engineering - 20201019 - HCBBS Forum
  15. Cooling tower type - HCBBS Forum
  16. World’s largest ethylene plant under construction in Saudi Arabia - HCBBS Forum
  17. 【Daily Discussion】Utilities - Civil Engineering - 20210106 - HCBBS Forum
  18. The main structure of the urea granulation tower for Hebei Zhengyuan’s hydrogen energy and clean, efficient comprehensive utilization of coal project has been successfully completed - HCBBS Forum
  19. The pouring of the foundations for the exhaust gas washing and cooling tower in C-0801 and the exhaust gas desulfurization tower in C-0802 as part of Yunnan Petrochemical’s closed-circuit coking unit renovation project was completed successfully - HCBBS Forum
  20. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210215 - HCBBS Forum
  21. 【Daily Discussion】Utilities - Civil Engineering - 20210409 - HCBBS Forum
  22. Dust control at construction sites – Sprinkler system - HCBBS Forum
  23. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210311 - HCBBS Forum
  24. CNPC Offshore has won bids for a total of 20 offshore new energy construction projects - HCBBS Forum
  25. 【Daily Discussion】Utilities - BIM - 20210301 - HCBBS Forum
  26. The trial production of the crude phenol refining project at Xinjiang Qinghua Energy Group was a success on the first attempt - HCBBS Forum
  27. The H₂S concentration tower for the second phase of the Baiyin Jingyuan Coal and Electricity Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Transformation) project has been successfully hoisted into place - HCBBS Forum
  28. Seeking help regarding the cost of reinforced concrete - HCBBS Forum
  29. Current condensate recovery and treatment in large petrochemical, chemical, and thermal power enterprises - HCBBS Forum
  30. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210314 - HCBBS Forum
  31. The concrete pouring for the 100.2-meter-high gasification framework II, the core structure of China Coal Yulin Phase II gasification project, was successfully completed - HCBBS Forum
  32. The hydrogenation project for the butadiene extraction unit at Fujian Gulei Petrochemical was successfully completed - HCBBS Forum
  33. Public Utilities Management System - HCBBS Forum
  34. 【Haichuan EPC】Understand the relationship between the “defect liability period”, “quality warranty period”, and “quality guarantee deposit”! - HCBBS Forum
  35. 【Daily Discussion】Utilities - BIM - 20210323 - HCBBS Forum
  36. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210208 - HCBBS Forum
  37. Multiple images: Installation of boiler drum and heat exchange surfaces - HCBBS Forum
  38. What is this doing? (2) - HCBBS Forum
  39. Construction of equipment foundations - HCBBS Forum
  40. Design review for the Ningxia coal-to-olefins project with an investment of 13.77 billion yuan - HCBBS Forum
  41. 【Daily Discussion】Utilities - Civil Engineering - 20210329 - HCBBS Forum
  42. A series of handbooks, including the new 12R301 Handbook on Design and Construction Drawings for Urban Natural Gas Distribution Projects - HCBBS Forum
  43. Piling work for the tank piles in the tank cluster of the Tianjin Shihua crude oil storage base renovation project has been completed - HCBBS Forum
  44. The first cryogenic tank panel for the second phase of Guangxi Hengyi New Materials Co., Ltd.’s 33,000 Nm³/h air separation project was successfully lifted into place - HCBBS Forum
  45. 【Discussion of the Day】Utilities – Water Resources and Hydropower – 20210531 - HCBBS Forum
  46. 【Daily Discussion】Utilities - Civil Engineering - 20210606 - HCBBS Forum
  47. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210301 - HCBBS Forum
  48. Stop hot work - HCBBS Forum
  49. The drawings require an independent fire extinguishing unit to be installed in the low-voltage cabinet - HCBBS Forum
  50. 【Daily Discussion】Utilities - Civil Engineering - 20210205 - HCBBS Forum
  51. The 108.5-meter-high granulation tower for Hebei Zhengyuan’s 300,000-ton ammonia synthesis project was successfully completed - HCBBS Forum
  52. 【Daily Discussion】Utilities - Civil Engineering - 20210506 - HCBBS Forum
  53. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210505 - HCBBS Forum
  54. 【Daily Discussion】Utilities - Civil Engineering - 20210202 - HCBBS Forum
  55. The trial run of the extrusion granulation unit of the 400,000 tons per year polypropylene plant in Guangxi Petrochemical’s integration and transformation project was successful on the first attempt - HCBBS Forum
  56. 【Daily Discussion】Utilities - Civil Engineering - 20210429 - HCBBS Forum
  57. 【Daily Discussion】Utilities - Civil Engineering - 20210514 - HCBBS Forum
  58. Is it necessary to use quick connectors for unloading materials in the tank farm? - HCBBS Forum
  59. 【Daily Discussion】Utilities - Civil Engineering - 20201014 - HCBBS Forum
  60. 【Daily Discussion】Utilities - BIM - 20210322 - HCBBS Forum
  61. 【Daily Discussion】Utilities - BIM - 20210204 - HCBBS Forum
  62. Pre-approval for the environmental impact assessment of Sinopec’s Guizhou coal chemical project, with an investment of 23.8 billion yuan - HCBBS Forum
  63. Construction begins on Rongxin Chemical’s 800,000-ton per year olefin production project in Shandong Energy Group - HCBBS Forum
  64. 【Haichuan Expands Horizons】One at birth, two in life – multiple-point lifting for heavy objects - HCBBS Forum
  65. Stability calculation of steel columns - HCBBS Forum
  66. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210108 - HCBBS Forum
  67. The debutane tower of Jinling Petrochemical’s Hydrocracking Unit 1 renovation project was successfully lifted into place - HCBBS Forum
  68. Successful hoisting of the shift gas scrubber for the desulfurization and decarbonization unit in Gansu Nenghua Jinchang Company’s coal chemical project - HCBBS Forum
  69. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210114 - HCBBS Forum
  70. The public utilities such as the water treatment station for the public works of the Guangxi Hengyi coal chemical project have been handed over - HCBBS Forum
  71. The first large-scale intelligent coal storage and distribution facility in Shuicheng, Guizhou, is now in the final stages of completion - HCBBS Forum
  72. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210412 - HCBBS Forum
  73. 【Daily Discussion】Utilities - Civil Engineering - 20210316 - HCBBS Forum
  74. The granulation tower of the urea plant in CNPC Tashihua’s green and low-carbon project was successfully completed - HCBBS Forum
  75. Steam delivery settlement: 3 GJ = 1 ton - HCBBS Forum
  76. The Xinjiang Xinji Energy project has completed two key milestones: the handover of the production office building and the lifting of heavy equipment in the first phase - HCBBS Forum
  77. 【Ten Years of Rapid Development in Chemical Equipment】1612–2024: Integrated Installation of 136-meter-tall, complex-shaped, heavy-duty steel structure modules for petrochemical plants - HCBBS Forum
  78. [Environmental Impact Assessment Announcement] Second public announcement regarding the environmental impact assessment for the Shanghai Xihua (Huoqiu) Pallet Production and Manufacturing Base project - HCBBS Forum
  79. 【Daily Discussion】Utilities - BIM - 20210319 - HCBBS Forum
  80. 【Daily Discussion】Utilities - Civil Engineering - 20210209 - HCBBS Forum
  81. Interpretation of 8.6.1 in the Fire Protection Design Standards for Petrochemical Enterprises? - HCBBS Forum
  82. Fire hose - HCBBS Forum
  83. Corrosion and protection of shut-down boilers - HCBBS Forum
  84. A project in Dazhou, Sichuan, with a total investment of 12.2 billion yuan, to produce 200,000 tons of ethylene glycol along with 100,000 tons of dimethyl carbonate - HCBBS Forum
  85. 【Daily Discussion】Utilities - Civil Engineering - 20210123 - HCBBS Forum
  86. The main structure of the fire training and observation tower for the Hainan Commercial Storage Phase II project has been successfully completed - HCBBS Forum
  87. 22CD 22CG 22CJ 22CS 22D 22G 22J 22K 22R 22S series catalog - HCBBS Forum
  88. 【Ten Years of Rapid Development in Chemical Processing Equipment】1901–2024: China National Petroleum’s first complete radiant section module for a cracking furnace was manufactured, delivered - HCBBS Forum
  89. The patent for “A Composite Foundation Pit Support Method” applied for by Shanghai Construction Engineering Group Co., Ltd. has been approved - HCBBS Forum
  90. 【Daily Discussion】Utilities - BIM - 20210106 - HCBBS Forum
  91. Ullanmore Regenerator Replacement Task Maintenance - HCBBS Forum
  92. 【Daily Discussion】Utilities - BIM - 20210205 - HCBBS Forum
  93. On the distribution of air volume in dust removal fans - HCBBS Forum
  94. Lifting of the steel truss for the 117-meter-high granulation tower - HCBBS Forum
  95. Pushing and sliding installation of 3000m3 acrylonitrile storage tank at the acrylonitrile plant - HCBBS Forum
  96. 【Daily Discussion】Utilities - Civil Engineering - 20210301 - HCBBS Forum
  97. 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210509 - HCBBS Forum
  98. 【Daily Discussion】Utilities - BIM - 20210206 - HCBBS Forum
  99. The H₂S concentration tower for the second phase of the Baiyin Jingyuan Coal and Electricity Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Renovation) project was successfully hoisted into place - HCBBS Forum
  100. 【Daily Discussion】Utilities - BIM - 20210605 - HCBBS Forum
Prev 11 12 13 14 15 16 17 Next