- 【Daily Discussion】Utilities - BIM - 20210306 - HCBBS Forum
- Series on dust control at construction project sites - HCBBS Forum
- The three projects – Gongzhong Tiansheng New Materials, Messer Gas, and Haohua Gas – have been officially connected to the power supply. - HCBBS Forum
- Series catalogs such as 09BD, 09BN, 09CD, 09CJ, 09D, 09DX, 09G, 09J, 09MR, 09S, etc - HCBBS Forum
- The CO2 desorption tower and H2S concentration tower of the low-temperature methanol washing unit in the Xinjiang Xinhui Energy project were successfully hoisted into place - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210312 - HCBBS Forum
- Why is major maintenance always carried out during the scorching heat? - HCBBS Forum
- The 1 million tons per year acetic acid production project at Shenghong Refining & Chemical in Lianyungang has entered the stage of equipment and steel structure installation - HCBBS Forum
- The cumulative water diversion exceeded 40 billion cubic meters! Let’s see how big countries and heavy weapons can optimize the water supply pattern - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210209 - HCBBS Forum
- 【Ethylene Tank Farm Technology】What are the types of low-temperature ethylene storage tanks? - HCBBS Forum
- High dissolved oxygen in the deaerator - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210603 - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20201019 - HCBBS Forum
- Cooling tower type - HCBBS Forum
- World’s largest ethylene plant under construction in Saudi Arabia - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210106 - HCBBS Forum
- The main structure of the urea granulation tower for Hebei Zhengyuan’s hydrogen energy and clean, efficient comprehensive utilization of coal project has been successfully completed - HCBBS Forum
- The pouring of the foundations for the exhaust gas washing and cooling tower in C-0801 and the exhaust gas desulfurization tower in C-0802 as part of Yunnan Petrochemical’s closed-circuit coking unit renovation project was completed successfully - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210215 - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210409 - HCBBS Forum
- Dust control at construction sites – Sprinkler system - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210311 - HCBBS Forum
- CNPC Offshore has won bids for a total of 20 offshore new energy construction projects - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210301 - HCBBS Forum
- The trial production of the crude phenol refining project at Xinjiang Qinghua Energy Group was a success on the first attempt - HCBBS Forum
- The H₂S concentration tower for the second phase of the Baiyin Jingyuan Coal and Electricity Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Transformation) project has been successfully hoisted into place - HCBBS Forum
- Seeking help regarding the cost of reinforced concrete - HCBBS Forum
- Current condensate recovery and treatment in large petrochemical, chemical, and thermal power enterprises - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210314 - HCBBS Forum
- The concrete pouring for the 100.2-meter-high gasification framework II, the core structure of China Coal Yulin Phase II gasification project, was successfully completed - HCBBS Forum
- The hydrogenation project for the butadiene extraction unit at Fujian Gulei Petrochemical was successfully completed - HCBBS Forum
- Public Utilities Management System - HCBBS Forum
- 【Haichuan EPC】Understand the relationship between the “defect liability period”, “quality warranty period”, and “quality guarantee deposit”! - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210323 - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210208 - HCBBS Forum
- Multiple images: Installation of boiler drum and heat exchange surfaces - HCBBS Forum
- What is this doing? (2) - HCBBS Forum
- Construction of equipment foundations - HCBBS Forum
- Design review for the Ningxia coal-to-olefins project with an investment of 13.77 billion yuan - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210329 - HCBBS Forum
- A series of handbooks, including the new 12R301 Handbook on Design and Construction Drawings for Urban Natural Gas Distribution Projects - HCBBS Forum
- Piling work for the tank piles in the tank cluster of the Tianjin Shihua crude oil storage base renovation project has been completed - HCBBS Forum
- The first cryogenic tank panel for the second phase of Guangxi Hengyi New Materials Co., Ltd.’s 33,000 Nm³/h air separation project was successfully lifted into place - HCBBS Forum
- 【Discussion of the Day】Utilities – Water Resources and Hydropower – 20210531 - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210606 - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210301 - HCBBS Forum
- Stop hot work - HCBBS Forum
- The drawings require an independent fire extinguishing unit to be installed in the low-voltage cabinet - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210205 - HCBBS Forum
- The 108.5-meter-high granulation tower for Hebei Zhengyuan’s 300,000-ton ammonia synthesis project was successfully completed - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210506 - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210505 - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210202 - HCBBS Forum
- The trial run of the extrusion granulation unit of the 400,000 tons per year polypropylene plant in Guangxi Petrochemical’s integration and transformation project was successful on the first attempt - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210429 - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210514 - HCBBS Forum
- Is it necessary to use quick connectors for unloading materials in the tank farm? - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20201014 - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210322 - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210204 - HCBBS Forum
- Pre-approval for the environmental impact assessment of Sinopec’s Guizhou coal chemical project, with an investment of 23.8 billion yuan - HCBBS Forum
- Construction begins on Rongxin Chemical’s 800,000-ton per year olefin production project in Shandong Energy Group - HCBBS Forum
- 【Haichuan Expands Horizons】One at birth, two in life – multiple-point lifting for heavy objects - HCBBS Forum
- Stability calculation of steel columns - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210108 - HCBBS Forum
- The debutane tower of Jinling Petrochemical’s Hydrocracking Unit 1 renovation project was successfully lifted into place - HCBBS Forum
- Successful hoisting of the shift gas scrubber for the desulfurization and decarbonization unit in Gansu Nenghua Jinchang Company’s coal chemical project - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210114 - HCBBS Forum
- The public utilities such as the water treatment station for the public works of the Guangxi Hengyi coal chemical project have been handed over - HCBBS Forum
- The first large-scale intelligent coal storage and distribution facility in Shuicheng, Guizhou, is now in the final stages of completion - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210412 - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210316 - HCBBS Forum
- The granulation tower of the urea plant in CNPC Tashihua’s green and low-carbon project was successfully completed - HCBBS Forum
- Steam delivery settlement: 3 GJ = 1 ton - HCBBS Forum
- The Xinjiang Xinji Energy project has completed two key milestones: the handover of the production office building and the lifting of heavy equipment in the first phase - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Equipment】1612–2024: Integrated Installation of 136-meter-tall, complex-shaped, heavy-duty steel structure modules for petrochemical plants - HCBBS Forum
- [Environmental Impact Assessment Announcement] Second public announcement regarding the environmental impact assessment for the Shanghai Xihua (Huoqiu) Pallet Production and Manufacturing Base project - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210319 - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210209 - HCBBS Forum
- Interpretation of 8.6.1 in the Fire Protection Design Standards for Petrochemical Enterprises? - HCBBS Forum
- Fire hose - HCBBS Forum
- Corrosion and protection of shut-down boilers - HCBBS Forum
- A project in Dazhou, Sichuan, with a total investment of 12.2 billion yuan, to produce 200,000 tons of ethylene glycol along with 100,000 tons of dimethyl carbonate - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210123 - HCBBS Forum
- The main structure of the fire training and observation tower for the Hainan Commercial Storage Phase II project has been successfully completed - HCBBS Forum
- 22CD 22CG 22CJ 22CS 22D 22G 22J 22K 22R 22S series catalog - HCBBS Forum
- 【Ten Years of Rapid Development in Chemical Processing Equipment】1901–2024: China National Petroleum’s first complete radiant section module for a cracking furnace was manufactured, delivered - HCBBS Forum
- The patent for “A Composite Foundation Pit Support Method” applied for by Shanghai Construction Engineering Group Co., Ltd. has been approved - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210106 - HCBBS Forum
- Ullanmore Regenerator Replacement Task Maintenance - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210205 - HCBBS Forum
- On the distribution of air volume in dust removal fans - HCBBS Forum
- Lifting of the steel truss for the 117-meter-high granulation tower - HCBBS Forum
- Pushing and sliding installation of 3000m3 acrylonitrile storage tank at the acrylonitrile plant - HCBBS Forum
- 【Daily Discussion】Utilities - Civil Engineering - 20210301 - HCBBS Forum
- 【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210509 - HCBBS Forum
- 【Daily Discussion】Utilities - BIM - 20210206 - HCBBS Forum
- The H₂S concentration tower for the second phase of the Baiyin Jingyuan Coal and Electricity Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Renovation) project was successfully hoisted into place - HCBBS Forum